<br />~ CITY OF <br />Efi<.\::r~ Elk River <br />River <br /> <br />2006 Highland Road Project <br />Construction Notes <br /> <br />Issue No.1 - June 27, 2006 <br /> <br />Following several months of planning, bids were opened for the Highland Road Project May 25, <br />2006, with Baurley Brothers Inc, as the low bidder. This newsletter is to inform residents within <br />the area of the proposed construction schedule and progress. <br /> <br />Proposed Construction <br />. The project involves the reconstruction of Highland Road from Proctor to Jackson to a <br />32 foot wide urban section with curb and gutter, a 6 foot concrete walk on the north <br />side of the road and a 10 foot bituminous trail along the south side of the road. <br />Sanitary sewer will be installed along the length of the road and sewer and water <br />services extended to the right of way for future connection by homeowners in the future <br />when they wish to do so. <br /> <br />Tentative Schedule <br />The Contractor anticipates beginning the project on Monday July 10, 2006. At that time the <br />bituminous road will be milled. The road will be closed to all thru traffic. Access will be <br />maintained for residents at all times. The Contractor will start construction of the project on the <br />east end installing sanitary sewer which ranges in depth from 10 to 20 feet. Once the sewer is <br />installed the water and sanitary services will be extended to the right of way line. Storm <br />sewer will be installed next and finally curb and gutter, pavement, trail and sidewalk. <br />The project schedule includes an interim competition date for traffic to be restored /' <br />along Highland Road from Jackson Street to Salk School by the time school starts II;jfjI;'l <br />and substantial completion of the construction by the end of October 2006. The final '. , lift <br />of pavement will be placed in 2007. As with any construction work, the schedule and completion <br />of the project will be somewhat dependent on the weather. We ask for your patience with <br />weather delays throughout this project. <br /> <br /> <br />Sewer and Water Service Locations <br />As part of the contract we will extend sewer and water services to the right of way line for each <br />home along Highland Road. The sanitary sewer service is a 4" PVC pipe and the water service is <br />a 1" copper pipe. In order to facilitate future connection to your private plumbing please take a <br />look at the plumbing inside your home and determine a location along the right of way you would <br />like to have the service extended to. You may wish to contact a sewer and water contractor and <br />get recommendations for this location. The Project Inspector will be providing wooden stakes <br />painted blue and green to each property to place indicating your preference. Keep in mind tree <br />locations and other obstacles you may encounter in your yard when you place these stakes. <br /> <br />~ ~~c~~~~~~ <br />