My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.7. SR 12-20-1993
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1993
>
12/20/1993
>
5.7. SR 12-20-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:22 AM
Creation date
7/5/2006 2:29:22 PM
Metadata
Fields
Template:
City Government
type
SR
date
12/20/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />rei -\) <br />( ); <br />!l~ <br /> <br /> <br />ITEM 5.7. <br /> <br />TO: <br /> <br />MAYOR & CITY COUNCIL <br /> <br />FROM: PAT KLAERS, CITY ADMINISTRATOR <br /> <br />DATE: DECEMBER 17, 1993 <br /> <br />SUBJECT: REVIEW JANUARY/FEBRUARY MEETING <br />SCHEDULE <br /> <br />The City Council needs to begin thinking about its winter 1994 <br />meeting schedule. <br /> <br />Appointments At this time it appears that limited extra <br />meeting time will be required by the Council to hold interviews <br />for the Boards and Commissions. As necessary, the Council can <br />do this during regular meetings, probably from 6:00 to 7:00 p.m. <br /> <br />Annual Reports The presentation of Annual Reports will <br />begin in later January, 1994. We will need to keep the 6:00 to <br />7:00 p.m. - one hour time frame open for these reports. There <br />are twelve Annual Reports and on some nights we can get two of <br />them in while on other nights the Annual Report may exceed one <br />hour with Council discussion. <br /> <br />e <br /> <br />CIP- As a continuation of the CIP that was done last winter, <br />we will need to meet and discuss 1994 plans. We should be able <br />to develop our 1994 work plan in two meetings. It is <br />recommended that we use the January 17th holiday and February <br />21st holiday to hold our CIP worksessions. These worksessions <br />will most likely exclude the "big three" engineering items as <br />outlined below. <br /> <br />WWTS Expansion, Storm Drainaqe Plan, and Traffic Study - Last <br />year the City Council held a Saturday worksession to review <br />these three issues. Since that time the City Engineer has <br />completed a lot of work on these projects and the Council has <br />received various updates from him on the status of the work <br />programs in these areas. Sometime this winter we need to meet <br />and finalize the traffic comprehensive plan; continue our <br />progress in finalizing a storm drainage plan and in <br />implementing the needed 1994 improvement projects plus <br />approving the proposed storm drainage funding sources; and also <br />analyze the finances and timing for a WWTS plant expansion. <br /> <br />e <br /> <br />East Hiqhway 10 This topic cannot be discussed without a <br />working knowledge of the status of the WWTS expansion plans for <br />the plant. Attached for your review is a 12/15/93 memo from <br />the City Engineer on the results of the survey that was sent to <br />the East Highway 10 property owners. A large map will be <br />available at the Council meeting for review. The memo is <br />really much easier to understand when looking at the map. The <br /> <br />P.O. Box 490 · 13065 Orono Parkway · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 <br />
The URL can be used to link to this page
Your browser does not support the video tag.