<br />Mr. Pat Klaers, Administrator <br />May 26, 1993 <br />Page Two <br /> <br />4. WATER TREATMENT FACILITY (WESTERN AREA) <br /> <br />Bids have been received for the water treatment facility in the Western Area. These bids <br />will be considered by the Utilities Commission at their June 8th meeting. We would <br />anticipate that the bid will be awarded at that time and construction will proceed. <br /> <br />s. MAIN STREET BRIDGE <br /> <br />As you are aware, the construction of the Main Street Bridge is nearing completion. We <br />anticipate that the approaches to the bridge from either side, which are the last major item <br />to be completed, will be worked on over the next couple of weeks. We anticipate the <br />bridge will be open sometime between June 13th and June 20th. <br /> <br />6. HERITAGE LANDING <br /> <br />The contract for Heritage Landing has been awarded to LaTour Construction. A <br />preconstruction meeting was held on Tuesday, May 25th. Construction is anticipated to <br />begin on Tuesday, June 1st. Construction will begin south of County Road 30 within the <br />Heritage Landing and Mississippi Oaks platted areas. Construction north of County Road <br />30 in the Fresno Street area will not begin until sometime after June 21st, and will be <br />completed within the time lines set out by the County for being through their property by <br />July 10th. <br /> <br />7. MISSISSIPPI OAKS <br /> <br />Plans and specifications for the fIrst phase of Mississippi Oaks are currently being <br />prepared. As you are aware, part of the improvements for this project are included in <br />the Heritage Landing project. The additional improvements needed to complete the <br />project are included in this set of plans and specifications. We anticipate plans and <br />specifications will come back to the City Council at their June 7th meeting for approval <br />and authorization to advertise for bids. <br /> <br />8. CHERRYHILL BLUFFS 2ND ADDITION <br /> <br />Plans and specifications for the fust phase of Cherryhill Bluffs 2nd Addition are being <br />prepared. We are currently working with MnDOT relative to the releasing of a strip of <br />land through this parcel. As was discussed with the Council previously, we would <br />anticipate the developer will just leave about five lots out of the fmal plat where this <br />MnDDT property is being worked on for turn back. This would then be platted at a later <br />date as phase 2. The plans and specifications should be ready for the City Council at <br />their June 7th meeting for approval and authorization of advertisement for bidding. <br /> <br />000-2604.may <br />