My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. SR 05-03-1993
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1993
>
05/03/1993
>
6.2. SR 05-03-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:13 AM
Creation date
6/15/2006 3:02:43 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/3/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />OLD CITY HALL SITE ON MAIN STREET AND HIGHWAY 10 <br /> <br />Install irrigation system <br />Build retaining walls <br />Plant trees and shrubs <br />Asphalt parking lot improvements <br />Paint striping <br /> <br />Labor Days <br />15 <br />40 <br />10 <br />10 <br />2 <br /> <br />This project has high visibility due to its location and, <br />therefore, the need for an aesthetically pleasing landscape. <br /> <br />COMMUNITY EDUCATION ATHLETIC FIELDS <br /> <br />Line soccer fields <br />Finish baseball infields <br />Class 5 parking lots <br />Install bituminous paving <br />Install trail system <br /> <br />Labor Days <br />6 <br />10 <br />15 <br />25 <br />10 <br /> <br />The grass on the athletic fields is growing well and the last <br />fencing will be installed in the next two weeks. The Area Wide <br />Recreation programs are planning on using these fields in early <br />June which means all of the work should be completed by then <br />except the bituminous paving and the trail system, either of <br />which could be done at a later date. <br /> <br />DEPOT SITE <br /> <br />Finish topsoil <br />Timber edging <br />Rail fence <br /> <br />Labor Days <br />3 <br />4 <br />4 <br /> <br />This work on this site is mostly nonskil1ed labor and would be <br />an excellent project for our summer youth workers. <br /> <br />LIQUOR STORE <br /> <br />Labor Days <br />2 <br />10 <br /> <br />Finish landscaping <br />Parking lot improvement w/drainage improvement <br /> <br />The project could be done in the very near future and have the <br />contractor on Main Street overlay the "street" area that <br />accesses Ron's Foods. <br />
The URL can be used to link to this page
Your browser does not support the video tag.