My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. SR 05-03-1993
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1993
>
05/03/1993
>
6.2. SR 05-03-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:13 AM
Creation date
6/15/2006 3:02:43 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/3/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-. <br /> <br />. <br /> <br />. <br /> <br />ORONO PARK <br /> <br />Labor Days <br />Grade the new park area 4 <br />Grade the trail from Orono Parkway to <br />Orono Beach 4 <br />Install Class 5 on Orono trail 8 <br />Install bituminous on Orono trail 12 <br />Move fishing pier 4 <br />Build steps to access fishing pier 10 <br />Build handicap access ramp to fishing pier 30 <br /> <br />The Orono trail will parallel the lakeshore from Orono Parkway <br />to the beach at Orono Park with an extension from the beach <br />area to the north end of the park up near the boat launch to be <br />installed in late summer or early fall. The fishing pier <br />relocation amount to many hours of work, but, in the long term, <br />it is going to be an ideal location for the pier, putting it <br />out of the swimming area, away from the boat launch, and near <br />the trail for easy pedestrian access. <br /> <br />We also have plans to install new drinking fountains that will <br />be connected to City water in Orono Park, but that will have to <br />be a fall project. <br /> <br />JACKSON SQUARE PARKING LOT <br /> <br />Labor Days <br />Remove existing surface 4 <br />Remove stumps (contractor) <br />Install storm drainage (contractor) <br />Install concrete curb & gutter (contractor) <br />Repair sidewalk cut 4 <br />Install Class 5 base 10 <br />Install bituminous surface 10 <br />Paint stripe parking stalls 2 <br />Install lighting system (contractor) <br />Install irrigation system 6 <br /> <br />The total project should be completed in two weeks with <br />cooperation from the contractors and the weather, and close <br />coordination with our crews. The lot would be unusable for the <br />entire two weeks and Jackson Place would also have to be closed <br />during the reconstruction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.