My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.2. SR 02-08-1993
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1993
>
02/08/1993
>
3.2. SR 02-08-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:07 AM
Creation date
5/25/2006 1:39:45 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/8/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />/~ .- -. ,_.- ..~-'-_. <br /> <br />. <br /> <br />SLR APplication and Work Plan <br />(The following format must be used) <br /> <br />District Sherburne County S.W.C.D. <br /> <br />(attach an eligibility cheCklist) <br /> <br />Project Name <br /> <br />1993 Mississippi River Bank Erosion <br />Elk River, Minnesota <br /> <br />Description of the problem: (include photographs of the project site) <br /> <br />Rip rap is currently located approximate~y 300 feet west of the <br />Elk River Bridge over the Mississippi River. Erosion continues <br />to occur where the existing rip rap ends. We are requesting <br />funding assistance to further mitigate .these erosion problems. <br /> <br />Project Objectives: <br /> <br />. <br /> <br />(1) . To control existing erosion problems along the Mississippi <br />River and protect the river bank. <br /> <br />(2) To allow further City planning to continue for a boardwalk <br />and park along the Mississippi River, as shown by <br />attached map. <br /> <br />(3) <br /> <br />Description of Measures Planned: (If not the least cost ~ontrol met~od(s). <br />explain; if a continuation of a previously funded SLR proJect, explaln) <br /> <br />This project would be a continuation of a previously funded <br />SLR Project in May 1991. This project allowed placement of <br />rip rap from the Elk River Bridge to the west. This application <br />would allow extension of this rip rap further to the west. <br />Rip rap is the most cost effective solution to the problem. <br /> <br />. Project Timetable: (Include a projected completion date) <br /> <br />Upon approval of the SLR application, the City would seek bids <br />from private contractors. We would plan to construct the <br />improvement as soon as possible following bids at a time when the <br />water level is low. The 1991 project was constructed in the winter. <br />'- E-4 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.