My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3. - 6.5. SR 02-01-1993
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1993
>
02-01-1993
>
6.3. - 6.5. SR 02-01-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:07 AM
Creation date
5/25/2006 10:04:59 AM
Metadata
Fields
Template:
City Government
type
SR
date
2/1/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.' <br /> <br />(08) Submittal of the Landfill Closure Sequencing Plan by <br />October 1, 1992, including interim surface water drainage <br />plans. <br /> <br />(09) Installation of Remedial Investigation water <br />monitoring wells according to the provisions of the <br />"Corrective Action Investigation Revised Work Plan", <br />December 1989 and April 14, 1991 submittal. Installation <br />to be completed by December 1, 1991. <br /> <br />. <br /> <br />(10) Sampling of Remedial Investigation water monitoring <br />wells according to the provisions of the "Corrective Action <br />Investigation Revised Work Plan" December 1989 and <br />April 14, 1991 submittal. Sampling to be completed by <br />May 1, 1992. <br /> <br />(11) Preparation and submittal of the Remedial <br />Investigation Report by August 1, 1992. <br /> <br />(12) Preparation and submittal of the Feasibility Study <br />Report by January 1, 1993. <br /> <br />(13) Installation of the Selected Remedial Action and <br />initiation of operation as necessary by October 1, 1993. <br />This date may be extended by action of the City Council, <br />upon a showing by Permittee that MPCA review and approval <br />of the proposed Remedial Action has caused a delay in <br />installation. <br /> <br />(14) Submittal of design and operations plans for future <br />Landfill expansion by November 3, 1993. <br /> <br />(15) Completion of the North Landfill slope final cover <br />system and submittal of a construction certification report <br />by December 1, 1993. <br /> <br />. <br /> <br />(16) Construction Ouality Assurance Reports. A <br />Construction Quality Assurance (CQA) Report shall be <br />submitted to the City prior to the placement of waste on <br />newly constructed lined areas. A CQA report shall also be <br />submitted for Landfill areas which receive final cover. <br />The report shall demonstrate that the work is completed to <br />the plan specifications. The Report shall be certified by <br />an engineer registered in the State of Minnesota and shall <br />include but not be limited to: <br /> <br />(a) All relevant construction specifications; <br /> <br />(b) All shop drawings for prefabricated components; <br /> <br />(c) Photo documentation of all critical aspects of <br />construction; <br /> <br />. <br /> <br />8. <br />
The URL can be used to link to this page
Your browser does not support the video tag.