Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />CUP, Steven Shoemaker <br />January 27, 1993 <br /> <br />Page 4 <br /> <br />6. <br /> <br />THE APPLICANT PROVIDE THE CITY WITH A DETAILED <br />GRADING PLAN AS OUTLINED IN TERRY MAURER'S LETTER <br />DATED JANUARY 20, 1993. <br /> <br />7. THE APPLICANT REIMBURSE THE CITY FOR THE COST OF <br />REVIEWING AND INSPECTING THE EXCAVATION PROJECT. <br /> <br />8. THE APPLICANT OBTAIN THE SIGNATURES OF THE PROPERTY <br />OWNERS FOR LOTS 8 AND 9, BLOCK 4, ROYAL OAKS RIDGE OR <br />THESE LOTS SHALL BE EXCLUDED FROM THE REQUEST. <br /> <br />9. THE HOURS OF OPERATION BE RESTRICTED FROM 8 A.M. TO 7 <br />P.M., MONDAY THROUGH SATURDAY. <br /> <br />10. EXCAVATION ACTIVITY SHALL BE COMPLETED WITHIN 2 YEARS <br />OF THE DATE OF THE APPROVAL. <br /> <br />11. STOCKPILING OF EXCAVATED DIRT SHALL BE APPROVED BY <br />CITY STAFF. <br />