My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.0. SR 01-18-1993
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1993
>
01-18-1993
>
4.0. SR 01-18-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:06 AM
Creation date
5/24/2006 2:48:49 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/18/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.' <br /> <br />. <br /> <br />. <br /> <br /> <br />-co, -R ~ ... ...,., <br />:" -,r . .. -1 <br />L.J .J. j j <br /> <br />CITY COUNCIL CIP WORK SESSION <br />March 28, 1990 <br /> <br />Page 36 <br /> <br />. <br /> <br />1992 CAPITAL IMPROVEMENT WORK PROGRAM <br /> <br />Waco Street <br /> <br />It is anticipated by this time that right-of-way property will <br />have been purchased and financing arranged with MnDOT. <br />Development of plans and specifications are anticipated. <br />Construction is desired in 1994 for a bridge over the Elk River <br />north of Highway 10 at Waco Street. <br /> <br />"Dam" Bridqe <br /> <br />Financing is anticipated to be arranged for this project prior <br />to this construction season. Plans and specifications are <br />anticipated to be approved. Construction is desired in 1992. <br /> <br />193rd Siqnal <br /> <br />Construction is anticipated in 1992 for this improvement. City <br />participation would come from the MSA Fund. It is desired to <br />receive a petition for this improvement from a developer and <br />also to use State turn back funds that are available from the <br />1988 project. <br /> <br />Railroad Drive and 3rd Avenue <br /> <br />Construction is anticipated if the feasibility study is <br />accepted, plans and specifications approved, and the assessment <br />hearing held after bids were received. <br /> <br />Dodqe Avenue and 5t~ Street <br /> <br />If a petition is received for this project, this improvement <br />could take place in 1992. A feasibility study is anticipated <br />to be received and accepted in 1991 for this project. The City <br />Council then would finalize the scope of the 5th Street <br />project. Funding for this improvement would come from MSA or <br />Capital Project monies. Total funding for the 5th Street <br />improvement is unknown but should be clarified in 1991. <br /> <br />Street Overlav and Seal Coatinq Proiects <br /> <br />Staff was instructed to evaluate the condition of the City <br />streets and to present information regarding needed overlays <br />and seal coated areas in early 1990. Most of this project <br />would be financed through the City General Fund. Some <br />assessment of overlay projects may take place depending <br />the need and direction from the City Council. <br /> <br />'" C( Q <br /> <br />~e;, <br />'(\0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.