My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3. SR 05-01-2006
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2006
>
05/01/2006
>
6.3. SR 05-01-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:59 AM
Creation date
4/28/2006 10:07:26 AM
Metadata
Fields
Template:
City Government
type
SR
date
5/1/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />VII. PERMITS <br /> <br />Several permits will be required prior to the proposed construction of the improvements. Required <br />permits include but are not limited to the following: <br /> <br />. Minnesota Department of Health <br />. Minnesota Pollution Control Agency <br />. Minnesota Pollution Control Agency (NPDES) <br /> <br />Watermain <br /> <br />Sanitary Sewer <br /> <br />Erosion/Sediment Control <br /> <br />VIII. INFORMATIONAL MEETING <br /> <br />An informational meeting was held on Thursday, March 30, 2006 relative to these proposed <br />improvements. A total of eight properties were represented. The Appendix contains the sign-up <br />sheet, presentation materials and minutes of the informational meeting. <br /> <br />IX. PROJECT COST <br /> <br />The estimated construction and project costs for the proposed street and utility improvements are <br />summarized in Table 1. Based on past experiences on similar projects in the City, the overhead items <br />have been estimated at 28% of the construction cost. These overhead costs include City <br />administration, engineering, design, construction staking, inspection, fiscal, and legal expenses. <br /> <br />Table 1 <br /> <br />Naples Street/186th Avenue Utility and Street Improvement <br />Project Cost Estimate <br /> <br />Street and Storm Sewer Improvements <br />Sanitary Sewer Improvements <br />Watermain Improvements <br />Estimated Total Construction Cost <br />Contingency (10%) <br />Overhead (28%) <br />Total Project Cost <br /> <br />$ 164,300 <br /> <br />72,100 <br /> <br />63,100 <br /> <br />$ 299,500 <br />30,000 <br /> <br />83.900 <br /> <br />$ 413,400 <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.