My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.8. - 6.11. SR 04-17-2006
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2006
>
04/17/2006
>
6.8. - 6.11. SR 04-17-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:56 AM
Creation date
4/14/2006 10:57:53 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/17/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Planning Commission / P 06-06 <br />April 11 , 2006 <br />Page 7 <br /> <br />A and B shall be paid at the time those lots are platted and at the rate applicable at <br />the time they are granted fInal plat approval. <br />4. Surface water management fee, at the rate applicable at the time of fInal plat, shall be <br />paid for Lot 1 (17.73 ac.) prior to releasing the plat for recording. Surface water <br />management fee for Oudots A and B shall be paid at the time those lots are platted <br />and at the rate applicable at the time they are granted fInal plat approval. <br />5. The preliminary plat approval shall be extended for 3 years from the date that the <br />Council grants fInal plat approval. <br /> <br />Conditional Use Permit <br /> <br />Staff recommends that the Planning Commission recommend approval of the conditional <br />use permit to expand the dealership with the following conditions: <br /> <br />1. All comments of the City Engineer shall be addressed. <br />2. The project will be completed in phases. <br />. Phase one will include all the site work including all paving and curbing, <br />removing the Highway 10 access and constructing the two new access drives; <br />stormwater ponding; signage; construction of the service addition on the <br />south side of the building, and construction of the carwash/ detail center. <br />. Phase two will include the additional offIce space and showroom. <br />. Phase three will include the parts area and service addition. <br />3. The area included in phase two and three shall be graded and seeded; no parking will <br />be allowed in this area. <br />4. Since the project is proposed to be completed in phases, the approval for the <br />conditional use permit shall be extended to 2010. <br />5. The existing access from Highway 10 shall be removed. <br />6. Because the applicant is proposing to utilize Low Impact Design techniques to <br />manage stormwater, curb and gutter will only be installed in areas to control runoff <br />and customer traffIc. <br />7. The existing home shall be removed. <br />8. Per Sec. 30- 859 no signage and/or decorations of any type, such as but not limited <br />to, banners, pennants, festoons, painted windows and balloons shall be allowed on <br />the vehicles. No temporary signs shall be allowed except as permitted under <br />Sec.30-866(7) <br />9. A letter of credit in the amount of $50,000 shall be provided prior to issuing the <br />grading or building permits. <br /> <br />S:\pLANNING\Case Files\2006\plat\p 06-06 Jabez\p 06-06PC4-11.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.