My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Council Agenda Packet February 2, 2026
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2026
>
02-02-2026
>
Council Agenda Packet February 2, 2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2026 11:28:10 AM
Creation date
2/20/2026 11:27:41 AM
Metadata
Fields
Template:
City Government
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 7 of 9 <br /> <br />2.10. Wire splices will be soldered and have heat shrink connectors or heat shrink covering with glue or done with <br />heat shrink butt connectors that have been heated and shrunk to wire or soldered and have heat-shrink that <br />has been shrunk to wire. <br /> <br />2.11. No wire nuts, closed end connectors or self-stripping displacement connectors (i.e. Scotch Loks) will be <br />accepted. <br /> <br />2.12. All lights must be LED. <br /> <br />2.13. Stop/Turn/Tail lighting must be 4” round lights in rubber grommets or 3”x 7” oval lights in rubber grommets <br />or MnDOT approved equal. Clearance and Marker lights must be 2” round lights in rubber grommets or <br />MnDOT approved equal. <br /> <br />2.14. For MnDOT any trailer that need brakes must have brakes on all axles. <br /> <br />2.15. The equipment is required to pass a Commercial Vehicle Inspection (CVI) by a licensed MnDOT commercial <br />vehicle inspector before payment will be made. If the equipment cannot pass the CVI from a licensed <br />inspector, the contractor will be contacted to pick up the equipment and make necessary repairs so the <br />equipment will pass a CVI. The Contractor will then return equipment in a condition that will pass a <br />Commercial Vehicle Inspection. The pickup, delivery, and repairs to the equipment to be at the contractor’s <br />expanse. <br /> <br />3. Equipment Options. <br />3.1. Equipment options include MnDOT wiring and lighting layout, long stroke brake chambers, and hot dipped <br />galvanizing. <br /> <br />3.2. If your trailers have Dexter Axles, you must offer long Stroke Brake chambers. MnDOT will not purchase <br />trailers with Dexter axles without long stroke brake chambers. <br /> <br />3.3. If you offer hot dipped galvanizing as an option, list the trailer models that can be hot dipped galvanized and <br />the price to galvanize each on the Price Pages. <br />• 2.0 Pricing Page Method 1 - Section No. 5.0 - Hot Dipped Galvanizing. <br />• 3.0 Catalog Discount Method 2- Option Line 2.3 - Hot Dipped Galvanizing. <br /> <br />3.4. You may add additional lines on the Price Pages in Section No. 2, Options, if you wish to offer additional <br />equipment options. <br /> <br />4. MnDOT Trailer MSO. <br />The Manufacture Statement of Origin (MSO) must be delivered to the Ordering Entity within fourteen (14) calendar <br />days of trailer delivery date (trailer to be delivered to the location designated on the PO). The payment process will <br />not start until both the trailer and MSO are received at the required locations of the Customer. <br /> <br />For MnDOT purchases, the MSO must be delivered to MnDOT Office, 6000 Minnehaha Ave, Fort Snelling, MN 55111. <br /> <br />5. Right to Add. <br />During the term of the contract, the State reserves the right to add additional equipment and accessories, upon <br />mutual agreement between the State and the Contractors through a duly executed amendment to the contract. <br /> <br />6. Equipment Orientation. <br />The cost of the equipment must include orientation to the end user that will familiarize the end user on how the <br />equipment will operate and all operating and safety instruction. <br /> <br />7. MnDOT Trailer MSO. <br />The Manufacture Statement of Origin (MSO) must be delivered to the Ordering Entity within fourteen (14) calendar days <br />of trailer delivery date (trailer to be delivered to the location designated on the PO). The payment process will not start <br />until both the trailer and MSO are received at the required locations of the Customer. <br /> <br />For MnDOT purchases, the MSO must be delivered to MnDOT Office, 6000 Minnehaha Ave, Fort Snelling, MN 55111. <br /> <br />Section 2: Additional Terms and Conditions <br /> <br />1. Transit Improvement Vehicle Excise Tax. <br />Page 44 of 111
The URL can be used to link to this page
Your browser does not support the video tag.