My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-12-09 - ERMU - Regular Commission Meeting
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2025-2030
>
2025
>
12-09-2025
>
2025-12-09 - ERMU - Regular Commission Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2025 10:06:27 AM
Creation date
12/18/2025 9:53:03 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/9/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
______________________________________________________________________________ <br /> <br />Page 1 of 1 <br /> <br /> <br /> <br /> <br /> <br />UTILITIES COMMISSION MEETING <br /> <br />TO: <br />ERMU Commission <br />FROM: <br />Chris Sumstad – Electric Superintendent <br />MEETING DATE: <br />December 9, 2025 <br />AGENDA ITEM NUMBER: <br />6.1f <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br /> <br />DISCUSSION: <br />• Installed 11 new residential services, which involves the connection of a secondary line <br />once the customer requests service. <br />• Joe Schmidt, Safety Instructor from MMUA, was here November 20 and held safety <br />meetings for all staff on winter driving, cold stress, and impairment. <br />• The bore crew crossed County Road 33, west of County Road 1, with two and four inch <br />conduits that will feed the new Meadowsweet Bend housing development. This looks to <br />be the end of the scheduled boring work for the season. With the frost setting in this <br />past week. The trencher will be used for most of the installation of wire over the winter. <br />• We switched some feeders and deenergized a couple of sections of overhead line this <br />past week so Xcel Energy can complete their transmission project work along County <br />Road 33 near the Martin Marietta gravel pit. <br />• The snow event over Thanksgiving weekend was a likely factor in a vehicle striking a <br />power pole along Highway 169 and another striking a padmount transformer along <br />Meadowvale Road. Both have been replaced. <br />• Crews terminated the wire at the Villas of Fillmore 3rd edition. This is six lots, three of <br />which already have power to the house. <br />• With asphalt installed in both Bradford 2nd addition and Meadowsweet Bend just before <br />freeze up, winter wire install looks likely. <br />• Crews finished up the ground work at East substation the third week of November. A <br />two man line crew worked with the substation tech for approximately three weeks, <br />which provided them the opportunity to learn and apply new skills. <br />• Crews are close to wrapping up the underground open concentric replacement job <br />along 223rd Avenue NW in Elk River. <br /> <br /> <br /> <br /> <br /> <br />158
The URL can be used to link to this page
Your browser does not support the video tag.