Laserfiche WebLink
New Residential Electric Connection - Developer - Lot with ERMU water service $975.00 <br />New Residential Electric Connection - Developer - Lot without ERMU water service $1,475.00 <br />New Electric Connection (standard)$900.00 <br />New Electric Connection - Non Standard Loads (i.e seasonal cabin, RV panel, Billboards, electric fence, etc.)100% <br />New Wire Footages over 200' (per foot)$5.00 <br />New Service Frost Trenching (per foot) $6.00 <br />New Commercial & Industrial Electric Connection 50% <br />Service Upgrades or Additions for Existing Customers 100% <br />Minimum Temporary Electric Service - Existing Transformer $350.00 <br />Minimum Temporary Electric Service - Without Existing Transformer $1,000.00 <br />Non-Standard Temporary Electric Service - (Additional infrastructure needed to install service to customer)100% <br />Grid Access Fee 5.20/kW <br />Street Light - 30' Decorative Pole with 6' Arm and Cobra Fixture $3,400.00 <br />Street Light - 23' Decorative Pole with Cobra Fixture $2,400.00 <br />Street Light - 14' Decorative Pole with Cobra Fixture $5,500.00 <br />Street Light - 14' Decorative Pole with Acorn Fixture $7,500.00 <br />Security Light - Wood Pole with Fixture $975.00 <br />Security Light - Existing Pole $350.00 <br />Pole Attachment Fee (per pole) $15.00 <br />Meter Installation Fee (per individually metered apartment unit)$25.00 <br />Water Access Charge = Water Connection Charge + Water Availability Charge $3,990.00 <br />Water Connection Charge (Per Plumbing Unit) - Builder $3,600.00 <br />Water Availability Charge (Per Plumbing Unit) - Developer $390.00 <br />Abandoned Water Service (minimum)$6,000.00 <br />Backflow Preventer Device Non-Compliance (per month)$100.00 <br />Deposit for 5/8" Hydrant Meter $175.00 <br />Deposit for 2 1/2" Hydrant Meter $1,500.00 <br />Hydrant Water Sales - Rental (per week)$50.00 <br />Hydrant Water Sales - Units (per 1000 gallons)3rd Tier Water Rate <br />Hydrant Wrench $40.00 <br />Private Hydrant Maintenance Program Monthly Fee $5.00 <br />Administrative Fee for Continued Submission of Checks After No-Check Notice Given $20.00 <br />Administrative Fee for Continued Submission of payment on a closed account $20.00 <br />Billable Cost of Materials Markup 15% <br />Billable Labor Markup 58% <br />Billable Vehicle / Equipment (per hour)$50.00 <br />Commerical Application Fee $20.00 <br />Electric Service Disconnect/Trip Fee - Meter Technician $50.00 <br />Electric Service Disconnect/Trip Fee - Line Crew $150.00 <br />Water Service Disconnect/Trip Fee - Water Operator $100.00 <br />Manual Meter Reading Fee (per month)$50.00 <br />Additional Meter Reading Fee (per month) $10.00 <br />Meter Tampering Fee $250.00 <br />Meter Testing Fee $50.00 <br />NSF Fee $30.00 <br />Penalty Amount 10% <br />Photocopies (per page)$0.25 <br />Red Tag Handling Fee $20.00 <br />Federal, state, and local taxes may apply <br />Adopted by the Utilities Commission on November 13, 2025 under authority per Minnesota Statute 412.361 <br />ELECTRIC <br />WATER <br />ADMINISTRATIVE <br />Elk River Municipal Utilities <br />2026 Utilities Fee Schedule