My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda Packet November 17, 2025
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2025
>
11-17-2025
>
City Council Agenda Packet November 17, 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2025 12:53:13 PM
Creation date
12/5/2025 12:47:37 PM
Metadata
Fields
Template:
City Government
type
SR
date
11/17/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />229446v1 <br /> 11. TIME OF PERFORMANCE. The Developer shall install all required public improvements <br />by November 30, 2026, with the exception of the final wear course of asphalt on streets. The final wear <br />course on streets shall be installed between August 15th and October 15th, the first summer after the <br />base layer of asphalt has been in place one freeze thaw cycle. The Developer may, however, request an <br />extension of time from the City. If an extension is granted, it shall be conditioned upon updating the <br />security posted by the Developer to reflect cost increases and the extended completion date. Final wear <br />course placement outside of this time frame must have the written approval of the City Engineer. No <br />street construction will be allowed after October 15 or prior to May 15 unless approved by the City <br />Engineer. <br /> 12. LICENSE. The Developer hereby grants the City, its agents, employees, officers and <br />contractors a license to enter the plat to perform all work and inspections deemed appropriate by the <br />City in conjunction with plat development. <br /> 13. EROSION CONTROL. Prior to initiating site grading, the erosion control plan, Plan B, shall <br />be implemented by the Developer and inspected and approved by the City. The City may impose <br />additional erosion control requirements if they would be beneficial. All areas disturbed by the grading <br />operations shall be stabilized per the MPCA Stormwater Permit for Construction Activity. Seed shall be <br />in accordance with the City’s current seeding specification which may include temporary seed to provide <br />ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched, and disc anchored as <br />necessary for seed retention. The parties recognize that time is of the essence in controlling erosion. If <br />the Developer does not comply with the MPCA Stormwater Permit for Construction Activity or with the <br />erosion control plan and schedule or supplementary instructions received from the City, the City may <br />take such action as it deems appropriate to control erosion. The City will endeavor to notify the <br />Developer in advance of any proposed action, but failure of the City to do so will not affect the <br />Page 74 of 379
The URL can be used to link to this page
Your browser does not support the video tag.