Laserfiche WebLink
<br />229446v1 <br />agreeable time at the City with all parties concerned, including the City staff, to review the program for <br />the construction work. <br /> In accordance with Minnesota Statutes 505.021, the final placement of iron monuments for all lot <br />corners must be completed before the applicable security is released. The Developer’s surveyor shall <br />also submit a written notice to the City certifying that the monuments have been installed following site <br />grading, utility and street construction. <br /> 9. PERMITS. The Developer shall obtain or require its contractors and subcontractors to <br />obtain all necessary permits, which may include: <br />A. Sherburne County for County Road Access and Work in County Rights-of-Way <br />B. MnDot for State Highway Access <br />C. MnDot for Work in Right-of-Way <br />D. Minnesota Department of Health for Watermains <br />E. MPCA NPDES Permit for Construction Activity <br />F. MPCA for Sanitary Sewer and Hazardous Material Removal and Disposal <br />G. DNR for Dewatering and water appropriations <br />H. Army Corps of Engineers for construction of sedimentation ponds <br />I. City of Elk River for Building Permits <br />J. MCES for Sanitary Sewer Connections <br />K. City of Elk River for Retaining Walls <br /> <br />10. DEWATERING. Due to the variable nature of groundwater levels and stormwater flows, <br />it will be the Developer’s and the Developer’s contractors and subcontractors responsibility to satisfy <br />themselves with regard to the elevation of groundwater in the area and the level of effort needed to <br />perform dewatering and storm flow routing operations. All dewatering shall be in accordance with all <br />applicable county, state, and federal rules and regulations. DNR regulations regarding appropriations <br />permits shall also be strictly followed. <br />Page 73 of 379