Laserfiche WebLink
<br />Oakwater Ridge EAW 8 <br />Findings of Fact and Conclusions, Response to Comments, and Record of Decision <br />U.S. Geologic Survey’s Earth Resource Observation and Science Center’s National Land Cover <br />Database (published September 26th, 2024) maps the property as primarily cultivated crops (163.33 <br />acres). Per the database, the project area consists of the following: deciduous forest (32.45 acres), <br />pasture/hay (29.27 acres), emergent herbaceous wetland (13.53 acres), open water (3.20 acres), <br />developed low intensity (2.15 acres), developed open space (1.25 acres), developed medium <br />intensity (1.37 acres), woody wetland (0.95 acres), and developed high intensity (0.14 acres). <br />2. Shorelands. The MnDNR identifies the Mississippi River as a Public Water Watercourse. The <br />western project area is within three hundred feet of the Mississippi River within the shoreland overlay <br />district. Chapter 30 of the Elk River City code outlines provisions for shoreland use. The use of any <br />shoreland of public waters, the size and shape of lots, the use, size, type and location of structures on <br />lots, the grading and filling of any shoreland area, the cutting of shoreland vegetation, and the <br />subdivision of land shall be in full compliance with the terms of applicable regulations. The City has <br />limitations in place regarding vegetation alterations within shoreland. Generally, vegetation alteration <br />necessary for the construction of structures, roads, and parking areas is exempt. <br />3. Floodplains. There are areas of Federal Emergency Management Area (FEMA) floodway, 100-year, <br />and 500-year floodplains mapped within the western site boundaries. According to the FEMA <br />floodplain map 27141C0395F (effective date November 16th, 2011) (FIRM number 270436) (panel <br />0395F), the floodplain within the project area is a ‘regulatory floodway.’ The base flood elevation <br />shown on FEMA’s floodplain map is 861 and 860 ft. MSL. Cross sections F and G from the Flood <br />Insurance Study Report of the Mississippi River are detailed in Question 12 of the EAW (Appendix <br />B). In accordance with the City of Elk River code, any use that requires fill, excavation, storage of <br />materials, or placement of anything that may cause a potential obstruction would require a permit. <br />4. Land Use. The project area is located within the urban service area. The City’s Land Use Plan map <br />(dated October 18th, 2021) identified the project area as ‘Mixed Residential’ and ‘Highway Business.’ <br />The surrounding land uses include ‘Public/Semi-Public, Traditional Single-Family Residential, <br />Industrial, Agriculture, and Business Park.’ Page 18 of the comprehensive plan shows the current <br />zoning for the northern portion of the project area as ‘FAST – Focus Area Study,’ the southern portion <br />as ‘R1d – Single Family Residential,’ and ‘BP – Business Park’ along US Highway 101. The master <br />plan for the Elk River 171st Avenue Focused Area Study (FAST) shows the northern half of the <br />project area as ‘Open Space,’ ‘Higher Density Residential,’ and ‘Destination Retail.’ <br />5. Geology and Soils. Generally, the site is flat, with steeper topography along the Mississippi River. <br />Based on the Digital Elevation Model (DEM), the hillside sloping down to the Mississippi River and <br />the lower cultivated field has slopes ≥18%. Portions of this hillslope met the definition of a bluff (per <br />the Sherburne County Zoning Ordinance and Elk River City Code). Per the Geotechnical Exploration <br />Report, “the vegetation and topsoil are not suitable for foundation, roadway, or utility support and will <br />need to be removed from below the building pads, pavements, utilities, and oversize areas and <br />replaced with suitable competed engineered fill, as need, to attain design graded.” The underlying <br />native alluvial soils were determined to be suitable for foundation, pavements, and utility support. <br />“However, the upper portions of the soil strata had a very loose relative density and prior to placing <br />additional fill or foundations we recommended compacting any loose soils and any soils disturbed <br />during the excavation and grading activities.” Grading of the site would be required during <br />construction. Mitigation based on typical erosion control and sedimentation regulations will be <br />provided. <br />6. Water Quality. Due to the current agricultural operation and previous bus maintenance operation, <br />runoff currently drains to the onsite wetlands and the Mississippi River, likely containing pollutants like <br />sediment, pesticides, fertilizers, and other nutrients. The established hayfields, open meadows, and <br />forested hillsides serve as buffers and allow for sediment to settle out. No permanent surface waters <br />are present within the Project Area. During construction, a City-approved Stormwater Pollution <br />Prevention Plan (SWPPP) and Permit is required. Similarly, the construction/grading activities will be <br />subject to NPDES Construction Stormwater General Permit regulations. The site will be graded to <br />promote surface water drainage and to maximize the runoff that is treated before leaving the site. <br />Stormwater from the residential and commercial development will be directed to permanent