My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-24-2025 PC MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Minutes
>
2020 - 2029
>
2025
>
06-24-2025 PC MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2025 7:37:02 AM
Creation date
7/23/2025 7:37:01 AM
Metadata
Fields
Template:
City Government
type
PCM
date
6/24/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Planning Commission Minutes <br />June 24, 2025 <br />--------- <br />Page 3 of 5 <br />4. Any disturbance to wetland areas shall require formal review and compliance with <br />state and local wetland regulations. <br />5. The applicant must apply for and receive all state and local permits prior to <br />beginning construction. <br /> Motion Carried 7-0. <br /> <br /> 4.3 Preliminary Plat: Sherburne Meadows, Sherburne County - 10638 205th Ave. NW <br /> Mr. Carlton presented the staff report. <br /> <br />Commissioner Booth asked about the easement located on Lot 2, Block 2. <br /> <br />Mr. Carlton stated there was an existing county road easement on that parcel. <br /> <br />Chair Beise opened the public hearing. There being no one present to speak, Chair Beise closed the <br />public hearing. <br /> <br />Moved by Commissioner Booth and seconded by Commissioner Zahler to recommend <br />approval of the Preliminary Plat for Sherburne Meadows, subject to the following <br />conditions: <br />1. An approved wetland replacement plan will be required. <br />2. Wetland boundaries identified on the plat may need to be updated after the subject site <br />has received a Notice of Decision. <br />3. If the road is not immediately constructed as a through street, a temporary cul-de-sac <br />will be required at the dead end. <br />4. Work with Elk River Municipal Utilities (ERMU) to secure required utility permits and <br />coordinate overhead power lines. <br />Motion carried 7-0. <br /> <br /> 4.4 Preliminary Plat: Oakwater Ridge, Capstone Homes - 16330 US Highway 10 <br /> Mr. Carlton presented the staff report. <br /> <br />Chair Beise opened the public hearing. There being no one present to speak, Chair Beise closed the <br />public hearing. <br /> <br />Commissioner Rydberg stated his major concern with this project has always been the safety of drivers <br />entering Highway 10, predicting future accidents. <br /> <br />Mr. Carlton stated the configuration of the access point has been a significant discussion with MnDOT <br />and Capstone. The recommendation is an R-cut, or reduced conflict interchange. The first phase of the <br />development before final platting will require an access permit from MnDOT, and MnDOT will not <br />approve anything more than a smaller first phase without those access improvements being in place. <br />The City Council and Capstone are working together to start the final design of the intersection. <br /> <br />Councilmember Wagner noted that significant conversations with MnDOT were an understatement. <br />She stated Rep. Emmer has been contacted for help with funding to bring the interchange sooner. <br />MnDOT said that their Highway 10 funding stops at the county line. She stated for reference, there has
The URL can be used to link to this page
Your browser does not support the video tag.