My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Files City Council Packet 07-21-2025
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2025
>
07-21-2025
>
Agenda Files City Council Packet 07-21-2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 2:51:20 PM
Creation date
7/22/2025 2:47:42 PM
Metadata
Fields
Template:
City Government
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
229446v1 <br />will be held by the City until the Developer's land surveyor certifies that all irons have been set following <br />site grading and utility and street construction. In addition, the certificate of survey must also include a <br />certification that all irons for a specific lot have either been found or set prior to the issuance of a <br />building permit for that lot. <br />E. The Developer shall be responsible for the cost of street light installation consistent with a street lighting <br />plan approved by the City and Elk River Municipal Utilities. <br />F. The Developer is required to submit the final plat in electronic format. The electronic format shall be <br />either AutoCAD.DWG file or a .DXF file. All construction record drawings (e.g., grading, utilities, <br />streets) shall be in electronic format in accordance with standard City specifications. All constructed <br />public utilities shall be field surveyed after construction with all location, elevation, and data attributes <br />information, deliverable to the City in an approved sub-foot accurate GIS/GPS format. <br />G. Until the Improvements are accepted by the City or a written agreement expressly reached in advance, <br />the Developer is responsible for snow removal and ensuring access by Emergency Response vehicles <br />and equipment. <br />H. All mailboxes shall be clustered and in a style and location acceptable to the City. <br />I. The Developer shall convey to the City, prior to the final approval of plans and specifications and at <br />no cost to the City, all permanent and temporary easements for the installation and maintenance of <br />all Improvements determined to be necessary by the City. All such easements shall be in recordable <br />form acceptable to the City and contain such terms and conditions as the City may prescribe. <br />24. SUMMARY OF SECURITY REQUIREMENTS. To guarantee compliance with the terms <br />of this Contract, payment of real estate taxes including interest and penalties, payment of special assessments, <br />payment of the costs of all public improvements, and construction of all public improvements, the Developer shall <br />furnish the City with a cash escrow, or letter of credit, in the form attached hereto, from a bank ("security") for $ <br />6,469,647.60. The security was calculated as follows: <br />CONSTRUCTION COSTS: <br />Page 74 of 299
The URL can be used to link to this page
Your browser does not support the video tag.