My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Files City Council Packet 07-21-2025
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2025
>
07-21-2025
>
Agenda Files City Council Packet 07-21-2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 2:51:20 PM
Creation date
7/22/2025 2:47:42 PM
Metadata
Fields
Template:
City Government
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
229446v1 <br />the fee schedule ($3,065.73/lot) to arrive at $1,327,461.09. The fee was then reduced by 81.5% to reach a prorated <br />value after accounting for the land dedication. The outstanding fee will be paid on a per-lot basis, but the cost will <br />be spread out over 351 lots rather than the full 433 as the first phase of 82 lots did not pay any park dedication fees. <br />The park dedication fee will be $699.66/lot for all remaining additions. <br />21. LANDSCAPING. Unless the lot already has two (2) trees on it, the Developer or lot purchaser <br />shall plant sufficient trees so that there are at least two (2) trees on every lot in the plat, one of which must be <br />planted in the front yard. Trees that are chosen by the Developer or property owner cannot cause a public nuisance, <br />such as cotton producing trees, or trees that may become a public hazard due to insect infestation or weak bark. <br />The minimum deciduous tree size shall be two (2) inches caliper, balled and burlapped. Evergreen trees must be <br />at least eight feet (8’) tall. The trees may not be planted in the right-of-way. The Developer or lot purchaser <br />shall sod the front yard, boulevard, and side yards to the rear of the structure on every lot. Weather permitting, <br />the trees, sod, and seed shall be planted within sixty (60) days after a home has received a certificate of occupancy. <br />Before a certificate of occupancy is issued, a cash escrow of no less than $1,000.00 per lot shall be furnished to <br />the City to guarantee compliance with the landscaping requirements. If the landscaping is not completed in a <br />timely manner, the City may enter the lot, perform the work, and apply the cash escrow toward the cost. Upon <br />satisfactory completion of the landscaping the escrow funds, without interest, less any draw made by the City, <br />shall be returned to the person who deposited the funds with the City. All trees shall be warranted to be alive, <br />of good quality, and disease free for twelve (12) months after planting. Any replacements shall be warranted for <br />twelve (12) months from the time of planting. The Developer or property owner is responsible for contacting <br />the City when all the landscaping has been installed to set up an inspection. Fifty percent (50%) of the security <br />will be released when all the landscaping has been installed and inspected by City staff and the remaining fifty <br />percent (50%) will be released one year after the landscaping inspection and any warranty work has been <br />completed. <br />All trees shall be warranted to be alive, of good quality, and disease free for twelve (12) months after <br />planting. Any replacements shall be warranted for twelve (12) months from the time of planting. The Developer <br />Page 72 of 299
The URL can be used to link to this page
Your browser does not support the video tag.