Laserfiche WebLink
<br /> <br /> <br />U S 1 0 & 1 6 5 th J -T u r n I m p r o v e m e n t s | E l k R i v e r B O L T O N & M E N K | 9 <br /> <br />FEES <br />Bolton & Menk, Inc.’s proposed fees to provide the described work will be billed hourly based on the enclosed <br />fee schedule with the total estimated cost to be: <br /> <br /> <br /> <br /> <br />These rates include labor, general business and other normal and customary expenses associated with operating <br />a professional business. The above rates include vehicle and personal expenses, mileage, telephone, survey <br />equipment, survey stakes and routine expendable supplies; and no separate charges will be made for these <br />activities and materials. <br /> <br />Accepted by: <br /> <br /> <br /> <br />Print Name/Title Date <br /> <br />City of Elk River, MN <br />US 10 and 165th Avenue J-Turn Improvements <br />Task <br />No.Work Task Description <br />Project ManagerSurvey CoordinatorTraffic LeadDesign LeadGraduate EngineerEngineering TechSurvey CrewClericalTotal <br />Hours <br />Total <br />Cost <br />Phase I: ICE Study and Preliminary Design <br />1.0 Project Management 18 0 4 0 0 0 0 4 26 $5,066 <br />2.0 Public and Agency Involvement 8 0 8 2 0 4 0 6 28 $4,906 <br />3.0 ICE Study 4 0 36 2 126 2 0 4 174 $28,512 <br />4.0 Preliminary Design & Level 1 Layout 12 8 11 36 136 22 32 6 263 $44,365 <br />Phase I: ICE Study and Preliminary Design Subtotal:$82,849 <br />Phase II: Final Design and Delivery <br />1.0 Project Management 36 0 0 4 0 0 0 6 46 $9,104 <br />2.0 Public and Agency Involvement 6 0 0 6 0 0 0 0 12 $2,400 <br />5.0 Final Design 48 0 28 120 166 46 0 6 414 $71,602 <br />6.0 Utility Coordination 4 0 0 14 0 4 0 2 24 $4,290 <br />Phase II: Final Design and Delivery Subtotal:$87,396 <br />Phase III: Construction <br />1.0 Project Management 16 4 0 4 0 0 0 8 32 $5,792 <br />2.0 Public and Agency Involvement 19 0 0 5 0 0 0 2 26 $5,218 <br />7.0 Construction Services 40 20 4 2 4 290 52 4 416 $70,646 <br />8.0 Project Closeout 4 0 0 2 0 28 4 4 42 $6,850 <br />Phase III: Construction Subtotal:$88,506 <br />Alternate Services <br />9.0 Signal Addition 40 4 40 120 160 120 10 4 498 $85,506 <br />Alternate Subtotal:$85,506 <br />$258,751TOTAL NOT-TO-EXCEED FEE <br />BOLTON & MENK, INC. <br />Page 268 of 309