My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Packet - 05-27-2025
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2025
>
05-27-2025
>
Planning Commission Packet - 05-27-2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2025 9:06:47 AM
Creation date
6/3/2025 9:03:03 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
5/27/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
29 <br />DOWNTOWN <br />Main Street and Jackson Avenue Redesign <br />The city is planning to <br />reconstruct Main Street <br />and Jackson Avenue in the <br />coming years, presenting an <br />opportunity to rethink the <br />layout and function of the <br />street. <br />The design “balance” of the <br />street today has about 75% <br />of the right of way used for <br />vehicles - traveling, delivering, <br />or parking. The redesign of <br />Main Street and Jackson Ave <br />should instead move each <br />towards a 50/50 balance, in <br />which the right of way supports <br />vehicles and pedestrian activity <br />in equal balance. <br />By doing so, Main Street has <br />the potential to become a <br />destination street in the city in <br />which daily activities happens. <br />Wider sidewalk space between <br />buildings and the street, would <br />allow for twice as much room <br />to walk, roll, dine, shop, and <br />gather, than currently exists <br />today. <br />To do this, the plan envisions <br />all angled parking is shifted <br />to parallel parking, and the <br />two travel lanes are reduced <br />to 11 feet. The space “gained” <br />from these changes is enough <br />to double the sidewalk space <br />on both sides of the street, <br />including a new boulevard <br />space with seating and <br />planters for trees. <br />20’ <br />SIDEWALK & <br />BOULEVARD <br />20’ <br />SIDEWALK & <br />BOULEVARD <br />20’ <br />SIDEWALK & <br />BOULEVARD <br />20’ <br />SIDEWALK & <br />BOULEVARD <br />9’ <br />PARKING <br />(incl. curb/gutter) <br />9’ <br />PARKING <br />(incl. curb/gutter) <br />11’ <br />TRAVEL <br />11’ <br />TRAVEL <br />11’ <br />TRAVEL <br />11’ <br />TRAVEL <br />9’ <br />PARKING <br />(incl. curb/gutter) <br />9’ <br />PARKING <br />(incl. curb/gutter) <br />MAIN STREET JACKSON AVEMain Street RedesignJackson Ave Redesign <br />MAIN STREET JACKSON AVECONTINUATION OF PLANTERS & STAIRS <br />Page 99 of 157
The URL can be used to link to this page
Your browser does not support the video tag.