My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Packet - 03-25-2025
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2025
>
03-25-2025
>
Planning Commission Packet - 03-25-2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2025 8:29:28 AM
Creation date
6/3/2025 8:26:52 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
3/25/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Affordable Luxury 763-427-3090 | capstonehomes-mn.com <br />c. 75’ Single Family Lot Width: <br />• 60’ home width <br />• 7.5’ side setback <br />• 30’ front/corner setback <br />• 30’ rear primary structure setback from Bluff where it applies (Wild and <br />Scenic Standards apply) <br />• Driveways will have a maximum width of 30’ measured at the ROW line. <br />d. 100’ Single Family Riparian Lot Width: <br />• 80’ home width <br />• 10’ side setback <br />• 30’ front/corner setback <br />• 30’ rear primary structure setback from Bluff where it applies (Wild and <br />Scenic Standards apply) <br />• 125’ rear primary structure setback from 10-year OHW (Wild and Scenic <br />Standards apply) <br />• Driveways will have a maximum width of 30’ measured at the ROW line. <br />3. Park Dedication: <br />a. 42.58 Acres dedicated of premium river front open space and greenway corridors <br />throughout the neighborhood. This acreage is outlined in the Master PUD Park <br />Exhibit. <br />b. The developer is requesting that the City design and install all park and trail <br />improvements in dedicated acreage areas within a reasonable time proceeding <br />complete dedication of lower park and greenway corridor land. <br />c. Dedication of land will coincide with multiple plats through future phases of <br />development. <br />d. Note: 15.87 of additional Open Space (Highway Berm and Community Entrances) <br />will be maintained by the Homeowners Association. <br />4. Offsite Utility and Roadway improvements: <br />a. Developer will provide utility connections from offsite locations to the boundary of <br />the project and throughout the full neighborhood. A significant cost is involved with <br />these offsite improvements. <br />b. Oversizing of services required by City will be credited to the Developer in the <br />corresponding phase of development. <br />c. Improvements are required at the location of Highway 10 and 165th Street. The <br />Developer has planned to contribute up to $200,000 towards the intersection <br />improvements. The balance of the improvement cost funding will be determined by <br />the City. This intersection is temporary and will be removed upon completion of the <br />MNDOT funded Twin Lakes Overpass. <br />5. Wild and Scenic River District PUD: <br />a. All Riparian (Lots adjacent to the river) Lots are 100’ wide measured at the OHW <br />(Ordinary High Water) level. <br />Page 30 of 55
The URL can be used to link to this page
Your browser does not support the video tag.