Laserfiche WebLink
WH <br />01 EXISTING OVERHEAD GARAGE DOOR, 10' <br />X 10' <br />04 EXISTING HEATED CONC. FLOORING, NO <br />WORK IS DONE TO MODIFY FLOORLING <br />02EXISTING GARAGE DOOR, SEE <br />SCHEDULE 02 EXISTING GARAGE DOOR, SEE <br />SCHEDULE <br />5' - 0" <br />49' - 3"21' - 2 3/4" <br />03 EXISTING WINDOW <br />02 EXISTING GARAGE DOOR, SEE <br />SCHEDULE <br />03EXISTING WINDOW <br />32' - 0"12' - 6"8' - 4"5' - 1 7/8"01 EXISTING OVERHEAD GARAGE DOOR, 10' <br />X 10'5' - 0"10' - 0"2' - 0"10' - 0"5' - 0"WAREHOUSE <br />STORAGE <br />001 <br />PACKAGING AREA <br />002 <br />1' - 2"4' - 10"1' - 2"4' - 10"1' - 2"4' - 10"1' - 2"4' - 10"1' - 2"4' - 10"2' - 0"03EXISTING WINDOW <br />03EXISTING WINDOW <br />03EXISTING WINDOW <br />03EXISTING WINDOW <br />03EXISTING WINDOW03EXISTING WINDOW <br />2' - 10"4' - 10"4' - 10"3' - 0" <br />21' - 2 3/4" <br />03 EXISTING WINDOW <br />4 3/4" ASSUMED 49' - 3"4 3/4" ASSUMED 4 3/4" ASSUMED6' - 11"2' - 1"2' - 9" <br />06LINE OF EXISTING FRP-1, 8' TALL <br />05 EXISTING FLOOR DRAIN <br />07 FF&E SHOWN FOR GRAPHIC CLEARITY <br />ONLY, SEE FF&E SHEET <br />08 EXISTING EXTERIOR TO REMAIN AS-IS, <br />NO WORK TO MODIFY STRUCTURE <br />09 EXISTING INTERIOR WALLS TO REMAIN <br />AS-IS, NO WORK TO MODIFY STRUCTURE <br />10 EXISTING INTERIOR WALLS TO REMAIN <br />AS-IS, NO WORK TO MODIFY INTERIOR <br />10EXISTING INTERIOR WALLS TO REMAIN <br />AS-IS, NO WORK TO MODIFY INTERIOR <br />3' - 0"1' - 3 5/8"1' - 3 5/8" <br />001A <br />001B <br />001C <br />002B <br />002A <br />002C <br />EXISTING & DEMO LINE TYPE <br />DEMO <br />EXISTING WALL <br />EXISTING AREA <br />NEW WALL <br />GENERAL BUILDING PLAN NOTES: <br />1. SCALE & ORIENTATION: ALL DIMENSIONS ARE INDICATED ON THE <br />DRAWING. NORTH ARROW INDICATING THE ORIENTATION OF THE <br />PLAN. DIMENSIONS AT INTERIOR PARTITIONS ARE TO FACE OF <br />SHEATHING OF FRAMING UNLESS NOTED OTHERWISE. WHERE CLEAR <br />DIMENSIONS ARE NOTED, THESE MUST BE MAINTAINED. NOTIFY THE <br />ARCHITECT AND OWNER IF DIMENSION ARE NOT CLEAR. <br />2. MATERIALS: ALL MATERIALS SHALL COMPLY WITH RELEVANT <br />BUILDING CODES AND REGULATIONS. <br />3. CODE COMPLIANCE: THIS DRAWING IS BASED ON THE LATEST <br />APPLICABLE BUILDING CODES AND REGULATIONS. ANY UPDATES OR <br />CHANGES TO CODES DURING CONSTRUCTION SHALL BE ADHERED <br />TO. THE ARCHITECT IS NOT RESPONSIBLE FOR ANY CHANGES OR <br />DEVIATIONS MADE TO THE PLANS WITHOUT PRIOR CONSULTATION <br />AND APPROVAL. <br />4. ACCESSIBILITY: DESIGN COMPLIES WITH ADA (AMERICANS WITH <br />DISABILITIES ACT) REQUIREMENTS WHERE APPLICABLE. <br />ACCESSIBLE ROUTES, RAMPS, AND OTHER NECESSARY FACILITIES <br />ARE SHOWN ON THE PLAN <br />5. COORDINATION: GENERAL CONTRACTOR TO COORDINATE THIS <br />PLAN WITH MECHANICAL. ELECTRICAL AND PLUMBING <br />SUBCONTRACTORS AS TO LOCATIONS FOR EQUIPMENT, FIXTURES, <br />METERS, DUCTWORK ETC TO BE UP TO CODE. NOTIFY ARCHITECT <br />IMMEDIATELY OF ANY CONFLICTS BETWEEN ARCHITECTURAL <br />DRAWINGS AND MEP SUBCONTRACTORS. <br />5A. ALL OPENINGS CUT, OPENINGS MADE OR EQUIPMENT INSTALLED <br />IN FIRE RATED WALLS, PARTITIONS, FLOORS OR CEILINGS SHALL BE <br />RESTORED SEALED FIRESTOPPED OR OTHERWISE CONSTRUCTED <br />TO MAINTAIN THE INTEGRITY OF THE FIRE RATING TO THE FULL <br />SATISFACTION OF THE ARCHITECT, ENGINEER AND BUILDING <br />OFFICIAL. THE GENERAL CONTRACTOR SHALL COORDINATE AND BE <br />RESPONSIBLE FOR THIS WORK. <br />5B. SEAL TOP SIDE OF PRECAST PLANK AND UNDERSIDE OF <br />PRECAST PLANK AT ALL VERTICAL PENETRATIONS. <br />5C. ALL EXPOSED PIPES, VENTS AND CONDUIT PENETRATING <br />WALLS, FLOORS OR CEILINGS SHALL HAVE FINISHED TRIM RINGS <br />(ESCUCHEONS). <br />5D. WHERE ACCESS PANELS ARE REQUIRED FOR EQUIPMENT, <br />UTILITIES OR DEVICES, THOSE PANELS SHALL BE INSTALLED <br />WHETHER OR NOT THEY ARE SPECIFICALLY SHOWN ON THE <br />DRAWINGS. WHEN INSTALLED IN A FIRE RATED ASSEMBLY, ACCESS <br />PANEL MUST BE FIRE RATED TO MATCH RATING OF THAT ASSEMBLY. <br />VERIFY ALL LOCATIONS WITH ARCHITECT BEFORE INSTALLING. <br />5E. PROVIDE BLOCKING IN WALLS FOR MOUNTING EQUIPMENT, <br />RAILS, STOPS, CASEWORK AND ALL OTHER SPECIALTIES AND <br />ACCESSORIES. <br />6. CHANGES AND REVISIONS: ANY CHANGES OR REVISIONS TO THE <br />PLANS MUST BE APPROVED BY THE ARCHITECT TO ENSURE <br />COMPLIANCE WITH THE DESIGN INTENT AND RELEVANT <br />REGULATIONS. <br />7. OWNER’S RESPONSIBILITIES: THE OWNER IS RESPONSIBLE FOR <br />OBTAINING ALL NECESSARY PERMITS AND APPROVALS FROM LOCAL <br />AUTHORITIES. THE OWNER IS RESPONSIBLE FOR PROVIDING <br />ACCURATE SURVEY DATA AND INFORMATION ABOUT SITE <br />CONDITIONS. <br />8. DISCLAIMER: THIS DRAWING IS FOR GENERAL INFORMATION <br />PURPOSES ONLY. THE ARCHITECT MAKES NO WARRANTIES, <br />EXPRESSED OR IMPLIED, REGARDING ITS ACCURACY OR <br />COMPLETENESS. <br />THE ARCHITECT SHALL NOT BE LIABLE FOR ANY DAMAGES OR <br />LOSSES RESULTING FROM THE USE OF THIS DRAWING WITHOUT <br />PROPER CONSULTATION AND COORDINATION. <br />Attn: This drawing does not include Mechanical, Electrical, or Plumbing <br />(MEP) details. Refer to separate MEP drawings for those specifications. <br />GENERAL DEMOLITION PLAN NOTES: <br />1. SCOPE OF DEMOLITION: THE DEMOLITION PLAN INDICATES THE <br />EXTENT OF DEMOLITION WORK TO BE PERFORMED. <br />ONLY AREAS SHOWN AS DEMOLISHED ON THIS PLAN SHALL BE <br />SUBJECT TO DEMOLITION. <br />2. SAFETY PRECAUTIONS: PRIOR TO COMMENCING DEMOLITION <br />WORK, ALL NECESSARY SAFETY MEASURES MUST BE IMPLEMENTED <br />ACCORDING TO OSHA (OCCUPATIONAL SAFETY AND HEALTH <br />ADMINISTRATION) REGULATIONS. PROTECTIVE BARRIERS, SIGNAGE, <br />AND SAFETY EQUIPMENT MUST BE PROVIDED AND MAINTAINED <br />THROUGHOUT THE DEMOLITION PROCESS. <br />3. ENVIRONMENTAL CONSIDERATIONS: DEMOLITION ACTIVITIES <br />SHALL COMPLY WITH ALL ENVIRONMENTAL REGULATIONS AND <br />GUIDELINES. PROPER DISPOSAL METHODS FOR HAZARDOUS <br />MATERIALS, INCLUDING ASBESTOS, LEAD, AND OTHER <br />CONTAMINANTS, MUST BE FOLLOWED. <br />4. UTILITIES DISCONNECTION: ALL UTILITIES (ELECTRICAL, PLUMBING, <br />HVAC, ETC.) SHALL BE PROPERLY DISCONNECTED AND TERMINATED <br />AS PER LOCAL CODES AND UTILITY PROVIDER REQUIREMENTS. <br />COORDINATION WITH UTILITY COMPANIES IS NECESSARY TO ENSURE <br />SAFE DISCONNECTION AND REMOVAL OF SERVICES <br />5. STRUCTURAL STABILITY: STRUCTURAL ELEMENTS TO REMAIN <br />SHALL BE PROTECTED FROM DAMAGE DURING DEMOLITION <br />OPERATIONS. ANY TEMPORARY BRACING OR SHORING REQUIRED <br />TO MAINTAIN STRUCTURAL STABILITY DURING DEMOLITION SHALL <br />BE PROVIDED AS NECESSARY. <br />6. WASTE MANAGEMENT: DEMOLISHED MATERIALS SHALL BE <br />SORTED AND DISPOSED OF IN ACCORDANCE WITH APPLICABLE <br />WASTE MANAGEMENT REGULATIONS. SALVAGEABLE MATERIALS <br />SHOULD BE IDENTIFIED AND SALVAGED WHENEVER FEASIBLE TO <br />MINIMIZE WASTE AND PROMOTE SUSTAINABILITY. <br />7. SITE PROTECTION: THE SITE SHALL BE PROTECTED FROM <br />UNAUTHORIZED ACCESS DURING DEMOLITION ACTIVITIES. <br />FENCING, BARRICADES, AND OTHER MEASURES SHALL BE <br />INSTALLED TO PREVENT ACCIDENTS AND MAINTAIN SITE SECURITY. <br />8. COORDINATION WITH AUTHORITIES: DEMOLITION WORK SHALL BE <br />CONDUCTED IN COORDINATION WITH LOCAL AUTHORITIES, <br />INCLUDING OBTAINING NECESSARY PERMITS AND APPROVALS. <br />COMPLIANCE WITH NOISE ORDINANCES, TRAFFIC REGULATIONS, <br />AND OTHER LOCAL REQUIREMENTS IS MANDATORY. <br />9. EMERGENCY PROCEDURES: EMERGENCY PROCEDURES, <br />INCLUDING EVACUATION ROUTES AND CONTACT INFORMATION FOR <br />EMERGENCY SERVICES, SHALL BE PROMINENTLY DISPLAYED ON- <br />SITE. <br />10. OWNER’S RESPONSIBILITIES: THE OWNER IS RESPONSIBLE FOR <br />SECURING NECESSARY PERMITS AND APPROVALS FOR DEMOLITION <br />WORK. THE OWNER SHALL PROVIDE ACCESS TO THE SITE AND <br />COOPERATE WITH THE DEMOLITION CONTRACTOR AS NEEDED. <br />11. DISCLAIMER: THIS DRAWING IS FOR INFORMATIONAL PURPOSES <br />ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THEIR <br />RESPONSIBILITY TO CONDUCT A THOROUGH SITE ASSESSMENT AND <br />IMPLEMENT APPROPRIATE DEMOLITION METHODS. <br />THE ARCHITECT ASSUMES NO LIABILITY FOR DAMAGES OR LOSSES <br />RESULTING FROM THE USE OF THIS DRAWING WITHOUT PROPER <br />CONSULTATION AND COORDINATION. <br />Attn: This drawing does not include Mechanical, Electrical, or Plumbing <br />(MEP) details. Refer to separate MEP drawings for those specifications. <br />RevDescriptionDateI hereby certify that this plan, specifications or report was <br />prepared by me and under my direct supervision, and that <br />I am a dully Licensed Architect under the laws of the State <br />Mennesota. <br />Printed Name: <br />Signature: <br />Date: Licensed #: <br />Scale: As indicated <br />Project #: 25-0316 <br />A2EL ROJO WHOLESALE <br />14270 201ST AVE NW, ELK RIVER, MN 55330 <br />Drawn By: CT <br />Checked By: KW <br />FLOOR PLAN - <br />LEVEL 1 <br />KERRIK WESSEL <br />4593003/25/25 <br />Approved By: BG <br /> 1/4" = 1'-0"A2 <br />1FLOOR PLAN - EXISTING EXISTING PLAN NOTES <br />NOTE <br />NUMBER NOTE DESCRIPTON <br />01 EXISTING OVERHEAD GARAGE DOOR, 10' X 10' <br />02 EXISTING GARAGE DOOR, SEE SCHEDULE <br />03 EXISTING WINDOW <br />04 EXISTING HEATED CONC. FLOORING, NO WORK IS DONE TO MODIFY FLOORLING <br />05 EXISTING FLOOR DRAIN <br />06 LINE OF EXISTING FRP-1, 8' TALL <br />07 FF&E SHOWN FOR GRAPHIC CLEARITY ONLY, SEE FF&E SHEET <br />08 EXISTING EXTERIOR TO REMAIN AS-IS, NO WORK TO MODIFY STRUCTURE <br />09 EXISTING INTERIOR WALLS TO REMAIN AS-IS, NO WORK TO MODIFY STRUCTURE <br />10 EXISTING INTERIOR WALLS TO REMAIN AS-IS, NO WORK TO MODIFY INTERIOR <br />REAR ELEVATION <br />SIDE ELEVATION <br />Page 159 of 197