Laserfiche WebLink
<br />I <br /> <br />Informational Meeting Minutes <br />Highland Street Reconstruction <br />February 15, 2006 <br />Page 4 of 4 <br /> <br />I <br /> <br />I <br /> <br />since vehicles do not have the option of straying off the blacktop onto the grass with <br />a barrier curb at the side of the road. <br /> <br />I <br /> <br />Q: <br />A: <br /> <br />Would the improvements to Highland Road include a crosswalk at Salk School? <br />In the design phase, we would look at both a' school zone signing and striping <br />package versus a crosswalk signing and striping package and make a determination of <br />what is more appropriate type of signing and striping to use in this area. <br /> <br />I <br /> <br />Q: <br />A: <br /> <br />Would I need to trim my trees for the sidewalk? <br />If any trees needed to be trimmed due to the sidewalk that are in the right-of-way, it <br />would be the city's responsibility as part of this project to undertake the trimming. <br />Sidewalks can also be meandered in the right-of-way to avoid mature vegetation. <br /> <br />I <br /> <br />I <br /> <br />4. <br /> <br />Adjournment <br />Having no more questions, the informational meeting was concluded at 7:20 p.m. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />s: \EngineerImprovProj\2006 Improvement Projects \Highland Road\Informational Meeting Minutes2.doc <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />