Laserfiche WebLink
Division: <br />Completed by: <br />Date:22MAY2024 <br />Performance Measure 2021 Actual 2022 Actual 2023 Actual 2024 Estimated 2024 YTD 2025 Projected <br />Centerline Miles of <br />Bitumunous Roadway 157 159 161 163 161 163 <br />Crack Seal Miles 22 16 18 20 12 20 <br />Street Sweeping 2.5 2.5 2.5 2 1 2 <br />EAB Tree Removals 0 0 0 200 0 250 <br />ROW Maintenance Mowing 2 2 2 2 1 2 <br />Parking Lots 20 21 21 21 21 21 <br />Snow and Ice Control <br />Utilize BMPs to extend pavement life <br />Sign Maintenance <br />Meet / exceed approved timelines for snow removal. Continue to reduce road salt usage while maintaining <br />safe winter driving surfaces through utilization of new equipment and applying BMPs for chemical <br />application. Develop a plan of action for future liquid deicing equipment. <br />Crack seal, pothole repair, mill and overlay, reclamation, and other procedures to maintain bituminous <br />roadways, parking lots, and trails to a 70% standard utilizing the Paser scoring system. <br />Continue to inspect and replace regulatory signage throughout the city. Update citywide signage for <br />consistency. Maintain railroad quiet zone delineators to BNSF standard. <br />EAB Management <br />Conduct EAB infested tree removal of publicly owned ash trees from road rights-of-way utilizing a <br />systematic approach in accordance with the city's EAB Management Plan. Provide public notice to <br />residents utilizing social media outlets, the city website, and door-knockers in affected areas. Assist the <br />public in answering questions relating to EAB management on privately owned trees. <br />Performance Measures & Goals for 2025 <br />Streets <br />Tim Sevcik <br />Division Goal Goal Objective/Task <br />Page 15 of 38