Laserfiche WebLink
SBOLTON ENGINEER'S PRELIMINARY COST ESTIMATE <br />& M E N K FOR REQUESTED VARIANCE LIMITS <br />Real People. Real Solutions. <br />DODGE AVENUE & 5TH STREET INTERSECTION VARIANCE REQUEST (25 MPH CURVES) <br />CITY OF ELK RIVER <br />BMI Project No.: 0111.133186 <br />H:\ELKR\OR1133186\3_Design\Variance Request\[Preliminary Cost Estimate 1.xlsx]Eng. Prelim. Estimate (3; 5/31/2024 <br />Subtotal <br />$83,800.00 <br />10% Contingency <br />$8,380.00 <br />Total:0 <br />00 <br />R/W Acquisition <br />$16,160.00 <br />Design, Administration and Construction Engineering <br />$13,830.00 <br />NOTE: Assume removal and roadway grading will be in all alternates so they have been excluded from this <br />estimate to only define cost differences <br />Page 65 of 372 <br />