My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.9 SR 06-17-2024
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2024
>
06-17-2024
>
4.9 SR 06-17-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2024 1:30:59 PM
Creation date
11/15/2024 1:30:58 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SBOLTON ENGINEER'S PRELIMINARY COST ESTIMATE <br />& M E N K FOR REQUESTED VARIANCE LIMITS <br />Real People. Real Solutions. <br />DODGE AVENUE & 5TH STREET INTERSECTION VARIANCE REQUEST (25 MPH CURVES) <br />CITY OF ELK RIVER <br />BMI Project No.: 0111.133186 <br />H:\ELKR\OR1133186\3_Design\Variance Request\[Preliminary Cost Estimate 1.xlsx]Eng. Prelim. Estimate (3; 5/31/2024 <br />Subtotal <br />$83,800.00 <br />10% Contingency <br />$8,380.00 <br />Total:0 <br />00 <br />R/W Acquisition <br />$16,160.00 <br />Design, Administration and Construction Engineering <br />$13,830.00 <br />NOTE: Assume removal and roadway grading will be in all alternates so they have been excluded from this <br />estimate to only define cost differences <br />Page 65 of 372 <br />
The URL can be used to link to this page
Your browser does not support the video tag.