Laserfiche WebLink
BOLTON ENGINEER'S PRELIMINARY COST ESTIMATE <br />& MENK FOR REQUESTED VARIANCE LIMITS <br />Real People. Real Solutions. <br />DODGE AVENUE & 5TH STREET INTERSECTION VARIANCE REQUEST (30 MPH CURVE) <br />CITY OF ELK RIVER <br />BMI Project No.: 0111.133186 <br />H:\ELKR\OR1133186\3_Design\Variance Request\[Preliminary Cost Estimate 1.xlsx]Eng. Prelim. Estimate (3; 5/31/2024 <br />Subtotal <br />$201,400.00 <br />10% Contingency <br />$20,140.00 <br />Total Estimated Construction Cost <br />0.00 <br />R/W Acquisition <br />$62,540.00 <br />Design, Administration and Construction Engineering <br />$33,230.00 <br />NOTE: Assume removal and roadway grading will be in all alternates so they have been excluded from this <br />estimate to only define cost differences <br />Page 66 of 372 <br />