My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.4 SR 05-20-2024
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2024
>
05-20-2024
>
7.4 SR 05-20-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2024 1:13:34 PM
Creation date
11/15/2024 1:13:34 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/20/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Open casual discussion. Stop me with questions or comments. <br />Sometimes I assume there is understanding when I don't provide <br />enough detail. My expectation if that I will be called out for anything <br />that I'm wrong about. <br />My point is not subjective, not conjecture but is verifiable and fact <br />based. There are two major components. 1. It is irresponsible to move <br />forward with the approval process of Phase 1 without careful <br />consideration of the impact on Phase 2. Reference The Request for <br />action 4.4. page 4 bottom. 2. For obvious reasons developers will not <br />build high density buildings next to their single family homes. (premium <br />value of lot, desirability) I have examples. <br />Only Phase 1? <br />We believe this approval process is set up to only address Phase 1. <br />Therefore, this needs to be addressed before the impact to our <br />property is discussed; <br />I believe we should look at the total development before <br />Phase 1 is approved <br />e Would the Planning commission only deal with Phase V? <br />Specific criteria not being met in Phasel. Mix of housing? <br />No reasonable person or company would approve a contract <br />that doesn't meet requirements and relies on unspecified, <br />undefined data <br />Example: 1. House build- no kitchen in plan- we will talk <br />about that latter 2. Road -first half is dependent on second <br />half that we can't include in approval process. <br />Page 156 of 430 <br />
The URL can be used to link to this page
Your browser does not support the video tag.