Laserfiche WebLink
for water main shutdowns, inspections, and testing of the new pipe. Projected costs for <br />planned water system work to be done within MnDOT's Highway 169 Redefine project <br />were paid in 2022, true up costs for any additional work needed during the project will <br />be included in the 2025 budget. <br />Work on the annual water system leak detection survey has begun. The initial part of <br />the survey should take a couple of weeks. The next step will be to investigate any <br />potential leaks identified. <br />Representatives of AT&T have requested more structural information on Freeport <br />Water Tower to decide if they want to pursue entering into a lease agreement with <br />ERMU to have telecommunication equipment on that tower. The representative said It <br />is difficult to know how long their decision will take. <br />The water operators have also been exercising and repairing distribution system gate <br />valves as part of the annual gate valve exercising program. <br />ATTACHMENTS: <br />• July 2024 Pumping by Well <br />Page 2 of 2 <br />113 <br />