My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5a ERMUSR 06-04-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2024
>
06-04-2024
>
5.5a ERMUSR 06-04-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 9:46:43 AM
Creation date
6/3/2024 1:26:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
6/4/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5/29/2024 <br />i <br />Classification and <br />Compensation Study <br />Elk River <br />Municipal UN <br />J <br />Project Methodology <br />Project Results <br />• Internal Equity = Job Evaluation <br />• External Equity = Market Study <br />• Pay Plan Development <br />• Implementation <br />Recommendations <br />Next Steps <br />M e[F otl olc5�y <br />Project Overview <br />Data Collection: project planning meetings to discuss <br />goals for the study and current challenges experienced <br />by existing classification and compensation plan, data <br />collected from the organization. <br />Position Review: SAFE was utilized for job evaluation, <br />to establish internal equity. Existing job descriptions <br />provided by the organization were the basis of this <br />evaluation. <br />Market Assessment: collection of base pay information <br />from peer organizations. <br />Pay Plan Development: pay plan development, grade <br />assignments, and implementation calculations. <br />Project Completion: final report, Commission <br />presentation, project documentation delivery. <br />120 <br />
The URL can be used to link to this page
Your browser does not support the video tag.