My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4a ERMUSR 06-04-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2024
>
06-04-2024
>
5.4a ERMUSR 06-04-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 9:46:30 AM
Creation date
6/3/2024 1:26:06 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
6/4/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK ORDER <br />Task Order No. 2 Effective Date: June 4.2024 <br />Task Order Amendment to the <br />DGR ENGINEERING <br />Master Agreement for Professional Services <br />DGR Engineering (Consultant) agrees to provide to: Elk River Municipal Utilities (Client), the <br />professional services described below for the Project identified below. The professional services <br />shall be performed in accordance with and shall be subject to the terms and conditions of the <br />Master Agreement for Professional Services executed by and between Consultant and Client on <br />the 22nd day of March , 20 23 . <br />TASK ORDER PROJECT NAME: East Substation Construction <br />TASK ORDER PROJECT DESCRIPTION: Client intends to construct a new 69/13.2 kV <br />substation. The substation will have one 115 kV line terminal, one 115 kV circuit breaker, one <br />69/13.2 kV transformer, an outdoor distribution box structure accommodating distribution circuits <br />with reclosers, a substation control enclosure, and associated materials as required. <br />DGR CONTACT PERSON: <br />CLIENT CONTACT PERSON: <br />SCOPE OF WORK: <br />Design Phase (Lump Sum): <br />Paul Konechne, Project Manager <br />Chris Kerzman, Engineering Manager <br />• Review and update general arrangement plan, section view drawings, and one -line <br />diagram and submit for Client review. <br />• Provide high-level project schedule and estimates as needed. <br />• Coordinate and arrange for field survey and topographic work at the substation site as <br />required. <br />• Review soil borings and geotechnical testing necessary for the project to be used in <br />designing foundations for the substation structures. <br />• Review soil resistivity testing to be used in designing the substation ground grid. <br />• Develop site grading plans using existing site development plans or new survey provided <br />by Client. Site grading plans include design and details for the access road, substation pad, <br />drainage outside the substation, and the SWPPP. <br />• Develop steel structures design based on typical structures furnished by Client. Provide <br />design for Client's review and for steel structure bidding after Client's review. <br />Pa,e r t,r6 <br />112 <br />
The URL can be used to link to this page
Your browser does not support the video tag.