My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Packet 04-23-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2024
>
04-23-2024
>
Planning Commission Packet 04-23-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2024 8:45:58 AM
Creation date
4/19/2024 12:30:23 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
4/23/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />2. The proposed subdivision is consistent with all applicable general and specialized city, county, and regional plans, <br />including, but not limited to, the city's comprehensive development plan. <br />The property is guided for business park uses and makes adequate provisions for protection of the regional <br />stormwater features. The subdivision is also consistent with all applicable plans. <br /> <br />3. The physical characteristics of the site, including but not limited to topography, soils, vegetation, susceptibility to <br />erosion and siltation, susceptibility to flooding, and drainage are suitable for the type and density of development and <br />uses contemplated. <br />The physical characteristics of the site are suitable for the type and density of development and uses <br />contemplated. <br /> <br />4. The proposed subdivision makes adequate provision for water supply, storm drainage, sewage transportation, <br />erosion control and all other services, facilities and improvements otherwise required in this article. <br />The parcels being platted are served by city utilities, but development may not occur until the proposed light <br />manufacturing use has been approved through the city’s site plan review process. Infrastructure and service <br />impacts will be reviewed as part of that process. <br /> <br />5. The proposed subdivision will not cause substantial environmental damage. <br />The subdivision will not cause substantial environmental damage. <br /> <br />6. The proposed subdivision will not conflict with easements of record or with easements established by judgment of a <br />court. <br />The proposed subdivision will not conflict with easements of record or with easements established by <br />judgment of a court. <br /> <br />7. The proposed subdivision will not have an undue and adverse impact on the reasonable development of neighboring <br />land. <br />Neighboring properties contain large lot industrial and commercial uses. The proposed subdivision will not <br />adversely impact the reasonable development of neighboring lands. <br /> <br />8. The proposed subdivision is not premature. A subdivision is premature if any of the following exists: <br />1. Lack of adequate stormwater drainage. <br />2. Lack of adequate roads. <br />3. Lack of adequate sanitary sewer systems. <br />4. Lack of adequate off-site public improvements or support systems. <br />The subdivision is not premature as the above conditions have been provided for <br /> <br />Financial Impact <br />Sale of the parcel will reimburse the city's development costs for the public infrastructure within the <br />subdivision. <br /> <br />Mission/Policy/Goal <br />Supports the growth and development of the business community. <br /> <br />Attachments <br />1. Location Map <br />2. Preliminary Plat <br />3. Preliminary Site Plan <br /> <br />Page 12 of 207
The URL can be used to link to this page
Your browser does not support the video tag.