My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1g ERMUSR 03-12-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2024
>
03-12-2024
>
6.1g ERMUSR 03-12-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 9:28:17 AM
Creation date
3/12/2024 3:12:56 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.0 Work Order and Data Integration AMI Meter Implementation <br />Allegiant Utility Services proprietary WMS, Peak Workflow"', is purpose-built platform for utility <br />mass deployment and exchange projects in the electric, water, gas, and clean energy markets. <br />Digital data is captured in real-time. As Technician captures data and photos, it is uploaded to <br />Allegiant's cloud instantly, allowing full role -based visibility to everyone on the project including <br />Utility staff, Program Managers, Project managers and affiliate team members. Allegiant's digital <br />platform reduces human error that can occur during large scale projects, ties seamlessly into <br />standard operating procedures and provides a managed workflow. All information captured in the <br />field can be efficiently reviewed and approved with the quality assurance features. Allegiant knows <br />the Technician may not always be connected, so Allegiant's mobile app is smart about managing <br />data allowing Technicians to work even in the remotest areas throughout the day. <br />Allegiant's project team will work with Utility's staff to develop and manage the transfer of data <br />throughout the course of the project. On average, it takes 3-4 weeks to set up all the files and <br />build out Allegiant's work order system for a project. Project start-up and WMS configuration can <br />be condensed to as little as 2 weeks as Allegiant's team has capability execute testing and setup <br />quickly. <br />6.1 Key Peak Workflow Features <br />Project Management <br />Track and visualize production across services installed vs. not installed <br />Overall status of all work orders <br />Understand all current activities in the field <br />Quality assurance tools <br />Customer Service <br />Searchable data and photos <br />Determine technician locations, view badges <br />Data Management <br />Completion Reports <br />Technician Performance Reports <br />Inventory Control Reports <br />Daily Activity Emails <br />Customized, Managed and Detailed Workflow <br />Enables in -field quality controls <br />Enforce SOP per project <br />Flexible per project requirements <br />Capture data, photos and GPS <br />Data validation on save <br />225 <br />
The URL can be used to link to this page
Your browser does not support the video tag.