My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1g ERMUSR 03-12-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2024
>
03-12-2024
>
6.1g ERMUSR 03-12-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 9:28:17 AM
Creation date
3/12/2024 3:12:56 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Both Parties will mutually agree to the schedule in the table below. <br />• The agreed upon schedule is expected to have a reasonable ramp -up period at <br />the start of the deployment followed with a steady state period anticipated to <br />occur over a continuous 10-month period and ending with a ramp down <br />process. <br />• A Deployment Schedule by EnclPoint will be created as part of the Installation <br />Workshops. <br />Project entails the following: <br />Completion of electric and water EndPoint quantities listed below. <br />If both Contractor and Utility agree, the dates below could be accelerated or extended. <br />Project Sponsors Logistical Kick-off: Month 1 <br />March 2024 <br />Logistics <br />(Within Two weeks from Contracting) <br />Phase I Initial Deployment Area (IDA): Month 1, 2 and 3 <br />March -May 2024 <br />Training and Install <br />Pre -Installation Planning, System 3 <br />—150 meters* <br />Integration, and Installing of IDA <br />meters <br />June 2024 <br />None. <br />*Work Stoppage Between Phase 1 and 30-60 days 2 <br />Phase II <br />Phase II Full Deployment: (Full System Months 4-13 10 <br />July 2024-May 2025 <br />Install all remaining <br />Deployment) <br />electric meters, water <br />modules and water <br />meters <br />TOTALTIME: 15 <br />15 months <br />Planned Deployment Timeline Meters Per Month <br />Month <br />Electric Meters <br />Water Meters & Modules Replacements <br />Water Modules to be Retrofit <br />with Existing Water Meter <br />Months 1-3 (IDA) <br />100 By <br />Contractor <br />20 By Contractor <br />5 <br />Full Deployment Area (the quantities below are estimates and will be finalized during pre -deployment <br />workshops) <br />4 <br />1210 <br />500 <br />75 <br />5 <br />1210 <br />500 <br />75 <br />223 <br />