My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1g ERMUSR 03-12-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2024
>
03-12-2024
>
6.1g ERMUSR 03-12-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 9:28:17 AM
Creation date
3/12/2024 3:12:56 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"EndPoint" shall mean new AMI meter, new AMI meter and module or a new AMI module to be <br />retrofitted with an existing water meter. <br />"End -User Customers" shall mean utility customers of Elk River Municipal Utilities. <br />"Installation Workshops" shall mean the structured startup Workshops led by Contractor for <br />Utility staff to jointly define the detailed requirements and specifications for this project. <br />"Installers" shall mean the field technicians who install meters for this project. <br />"Life Support" shall designate locations where there is Life Support Equipment or other critical <br />service requiring an appointment to install meters for this project. <br />"Peak Workflow" (Contractor's Work Management software) shall mean the workforce <br />management software product used by Contractor for managing the performance of Services on <br />this project. The utility will be using Peak Workflow for dashboard and program analytics. <br />"Route" shall mean meter reading routes. <br />"RTUs— Return to Utility" shall mean those Contractor work orders that need to be returned to <br />Utility for further investigation or other action as defined in the Installation Workshops. RTUs are <br />deemed complete as it relates to billing and completed work orders. <br />"Services" shall mean labor, material, equipment, tools, vehicles, transportation, storage, and <br />other things and actions necessary to perform and to complete the scope set forth in this <br />Statement of Work. <br />"UTC — Unable to Complete" shall mean those installations that Contractor is not currently able <br />to complete due to issues of access or other reasons to be identified during the Installation <br />Workshops. For avoidance of doubt, UTC items are still the responsibility of Contractor until they <br />are either resolved or change to RTU status. <br />"Utility " shall mean Elk River Municipal Utilities. <br />3.0 Contractor Services <br />3.1 Quantity of Endpoint Installation: Installation of meter and modules quantities and schedule <br />listed below in Section 3. <br />3.2 Customer Appointment Letters: Printing and Distribution of Pre -installation Customer <br />Appointment Letters to all accounts. <br />3.3 Door Hangers: Printing of post -deployment door hanger to be hung in the field by the <br />installer during deployment. The Utility will draft the verbiage and graphics for the post cards <br />and door hangers and approve the final draft prior to printing by Contractor. <br />3.4 Scheduling of Appointments: Contractor will use their software to schedule the EndPoint <br />installations. <br />220 <br />
The URL can be used to link to this page
Your browser does not support the video tag.