My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1g ERMUSR 03-12-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2024
>
03-12-2024
>
6.1g ERMUSR 03-12-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 9:28:17 AM
Creation date
3/12/2024 3:12:56 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.9 <br />Comments section is to include the correct versus incorrect data found and note follow-up <br />flag details. <br />582 <br />No Charge <br />8.1 <br />Premise as -found condition (based on list to be provided by Purchaser). <br />582 <br />No Charge <br />8.11 <br />Premise as -left condition (based on list to be provided by Purchaser). <br />582 <br />No Charge <br />8.12 <br />Certification that locks and seals are in place - Installer indicate Y/N. <br />582 <br />No Charge <br />8.13 <br />Digital photograph of the as -found existing meter/meter read. <br />582 <br />No Charge <br />8.14 <br />Digital photograph of the empty water meter with meter register removed. <br />582 <br />No Charge <br />8.15 <br />Digital photograph of the as -left installed meter/meter read. <br />582 <br />No Charge <br />8.16 <br />If repair is required, a digital photograph of the water meter with the meter removed <br />revealing appearance (blocked, buried, other). <br />582 <br />No Charge <br />Total Add -on Services Priced Incrementally <br />$ <br />Vendor Assumptions <br />1 If you ERMU elects to have Allegiant dispose of the ERT batteries, we charge $4.85 each and provide an environmental certification. <br />2 Blanket Permit with a Master Plumber fee is $2500 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />Installation Cost Summary <br />Proposed Costs <br />1 <br />One -Time Set -Up Fees <br />$ 41,039.11 <br />2 <br />Incremental One -Time Set -Up Fees <br />$ 11,157.00 <br />3 <br />Electric Meter Installation Fees <br />$ 212,761.80 <br />4 <br />If proposed and not included in 3 above - Incremental Electric Installation Fees <br />$ 14,931.60 <br />5 <br />Water Meter/Module Installation Fees <br />$ 450,053.08 <br />6 <br />Retrofit Installation Fees <br />$ 41,317.84 <br />7 <br />If proposed and not included in 5 above - Incremental Water Meter/Module <br />Installation Fees <br />$ - <br />8 <br />If proposed and not included in 6 above, Incremental Retrofit Water Installation Fees <br />$ - <br />Total Proposed Cost <br />Note: Vendors should confirm Summary for their own accuracy. <br />771,260.43 <br />218 <br />
The URL can be used to link to this page
Your browser does not support the video tag.