Laserfiche WebLink
Cycle Planning: Upon award, Supplier should provide its detailed process and work flows for meter cycle selection and <br />X <br />cycle requests that it plans to use. As part of the routine execution of its work, the Supplier may be required to provide <br />periodic cycle Requests prior to release of cycle data to Supplier, so that Purchaser can confirm that Supplier's cycle <br />Request meets all Network Deployment and other business requirements of the Purchaser prior to release and approval. <br />Meter replacements may be suspended during billing windows based on the cycle. Purchaser has provided a file listing <br />specific meters to be installed by month and a listing of the current meter cycle that each meter belongs to but we are <br />not providing any cycle planning scripts. A CIS map can be provided with the general location of each meter. Purchaser <br />may request irrigation and seasonal meters to be done during the months of July September <br />3yae merer eegin xeae e�arx ourrw <br />snn� sim� snuzflz3 <br />: s/sc­ sA /p snu2@3 <br />3 sAs/mci `WcV oz3 snu­ <br />sn2r 23 9nwp23 uv112 3 <br />3 snsno23 w/,-3 wA2/2W3 <br />2 1u/e/2 3n/Wj2W1 3nAs/2.. <br />38 <br />Yes <br />3 11/l/M l wA2nW3 uv /­ <br />nap/ 23 wPo2 2/2/2M <br />3 W/2v. 31/10@3 <br />2 11/9ip23 3u3u-3 3122nM. <br />3 w3,r 23 rrzol 23 3u3on@3 <br />4 111n1 2 3112x1— ru /n <br />3 12i1/2o23 Wsizoz3 32u102M <br />2 12i1/2o23 colPic3 3uocic. <br />We will load all Blackout dates into our WOM's <br />3 12/1no23 32/1112o23 3?/.12M <br />solution to ensure meters will not be changed <br />out when they are up for billing. <br />Day tuck Ahead: Supplier may be required, on a daily basis, to provide purchaser with a '1-day look ahead" that <br />X <br />contains the key cycles that Supplier intends to deploy meters and modules on. The format of the data should be <br />39 <br />mutually agreed to. <br />Yes <br />Information Technology <br />Data Security, Synchronization, and Upload. Through automated means, the Supplier should record all appropriate <br />X <br />meter exchange and module installation information and provide the data in a common readable electronic format for <br />40 <br />batch upload into Purchaser' IT systems no later than end of the business day. <br />41 <br />Minimum Information Required. The Supplier should list the minimum customer information that Purchaser will need <br />X <br />to supply to perform the work. <br />Batch Completion of AM[ Meer Exchange Installation Service Orders -'To Utility", on no less than a daily basis, <br />X <br />Supplier should process the completion of bulk AMI meter exchanges and send to Purchaser's CIS. The file data <br />42 <br />requirements, format, transfer methodology and frequency of these requests should be mutually agreed to between <br />Yes <br />Supplier and Purchaser. Note, Attachment IV defines the Integration to Meter Exchange Integration method. <br />Data Elements and Installer Tasks for Electric Change -Outs. The Supplier should capture and transfer the data <br />elements listed below: The Supplier should capture and transfer the data elements listed below: <br />43 <br />ID of the installer. <br />X <br />44 <br />Date/time the order is completed. <br />X <br />45 <br />Read from the removed electric meter. <br />X <br />46 <br />Read from the new electric meter. The reading from the electric meter being installed is expected to be zero. <br />X <br />47 <br />Serial number of the electric meter being installed. <br />X <br />48 <br />Sensus FlexNet ID Number. <br />X <br />49 <br />Meter number of the electric meter being removed; if applicable. <br />X <br />50 <br />Follow-up Rags indicafing that Purchaser should investigate situations found at a premise such as <br />X <br />51 <br />Comments section is to include the correct versus incorrect data found and note follow-up flag details. <br />X <br />52 <br />Premise as found condition (based on list to be provided by Purchaser). <br />X <br />53 <br />Premise as -left condition (based on list to be provided by Purchaser). <br />X <br />54 <br />Certification that locks and seals are in place -Y/N. <br />X <br />Global Positioning System (CPS). The Supplier should capture CPS spherical (latitude, longitude, and altitude) <br />X <br />coordinates for each electric meter with an accuracy no worse than plus or minus three (+/- 3) meters. The process <br />55 <br />description should include specifications for the field device to be used, device settings (e.g., PDOP mask value, etc.), and <br />any differential processing method to be used. Data should be delivered in a format with a spatial reference that can be <br />readily used by Pur haser's' GIS. <br />56 <br />Digital photograph of the as found meter/meter read. <br />X <br />57 <br />Digital photograph of the empty electric meter can with meter removed. <br />X <br />58 <br />Digital photograph of the as -left meter/meter read (Meter Socket). <br />X <br />59 <br />If repair required, a digital photograph of the electric meter with the meter removed revealing appearance. <br />X <br />205 <br />