If both Contractor and Utility agree, the dates below could be accelerated or extended. <br />Project Sponsors Logistical Kick-off: Month 1 I TMarch 2024 <br />(Within Two weeks from Contracting) <br />Phase I Initial Deployment Area (IDA): Month 1, 2 and 3 March -May 2024 <br />Pre -Installation Planning, System 3 <br />Integration, and Installing of IDA <br />meters <br />*Work Stoppage Between Phase 1 and 30-60 days 2 June 2024 <br />Phase II <br />Phase II Full Deployment: (Full System Months 4-13 10 July 2024-May 2025 <br />Deployment) <br />TOTAL TIME: 1 15 <br />Planned Deployment Timeline Meters Per Month <br />Logistics <br />Training and Install <br />—150 meters* <br />None. <br />Install all remaining <br />electric meters, water <br />modules and water <br />meters <br />15 months <br />Month <br />Electric Meters <br />Water Meters & Modules Replacements <br />Water Modules to be Retrofit <br />with Existing Water Meter <br />Months 1-3 (IDA) <br />100 By <br />Contractor <br />20 By Contractor <br />5 <br />Full Deployment Area (the quantities below are estimates and will be finalized during pre -deployment <br />workshops) <br />4 <br />1210 <br />500 <br />75 <br />5 <br />1210 <br />500 <br />75 <br />6 <br />1210 <br />500 <br />75 <br />7 <br />1210 <br />500 <br />75 <br />8 <br />1210 <br />500 <br />75 <br />9 <br />1210 <br />500 <br />75 <br />10 <br />1210 <br />500 <br />75 <br />11 <br />1210 <br />500 <br />51 <br />142 <br />