My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2 SR 01-02-2024
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2024
>
01-02-2024
>
4.2 SR 01-02-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 2:12:28 PM
Creation date
12/29/2023 8:08:17 AM
Metadata
Fields
Template:
City Government
type
SR
date
1/2/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rolling Hills Pond Dredging <br />Ell< River, Minnesota <br />shall not be entitled to receive any further payment until the work is finished. If the unpaid balance <br />of the contract price exceeds the direct and indirect costs of completing the project, including <br />compensation for additional professional services, such excess shall be paid to the Contractor. If such <br />costs exceed such unpaid balance, the Contractor will pay the difference to the Owner. Such costs <br />incurred by the Owner will be determined by the Engineer and incorporated in a Change Order. <br />18.3 Where the Contractor's services have been so terminated by the Owner, said termination shall <br />not affect any right of the Owner against the Contractor then existing or which may thereafter accrue. <br />Any retention or payment of monies by the Owner due the Contractor will not release the Contractor <br />from compliance with the Contract Documents. <br />18.4 After ten (10) days from delivery of a written notice to the Contractor and the Engineer, the <br />Owner may, without cause and without prejudice to any other right or remedy, elect to abandon the <br />project and terminate the Contract. In such case, the Contractor shall be paid for all work executed <br />and any expense sustained plus reasonable profit. <br />18.5 If, through no act or fault of the Contractor, the work is suspended for a period of more than <br />ninety (90) days by the Owner, or under an order of court or other public authority, or the Engineer <br />fails to act on any request for payment within thirty (30) days after it is submitted, or the Owner fails <br />to pay the Contractor substantially the sum approved by the Engineer or awarded by arbitrators within <br />thirty (30) days of its approval and presentation, then the Contractor may, after (10) days from delivery <br />of a written notice to the Owner and the Engineer terminate the Contract and recover from the Owner <br />payment for all work executed and all expenses sustained. In addition and in lieu of terminating the <br />Contract, if the Engineer has failed to act on a request for payment or if the Owner has failed to make <br />any payment as aforesaid, the Contractor may upon ten (10) days written notice to the Owner and the <br />Engineer stop the work until paid all amounts then due, in which event and upon resumption of the <br />work, Change Orders shall be issued for adjusting the contract price or extending the contract time <br />or both to compensate for the costs and delays attributable to the stoppage of the work. <br />18.6 If the performance of all or any portion of the work is suspended, delayed, or interrupted as a <br />result of a failure of the Owner or Engineer to act within the time specified in the Contract <br />Documents, or if no time is specified, within a reasonable time, an adjustment in the contract price or <br />an extension of the contract time, or both, shall be made by Change Orders to compensate the <br />Contractor for the costs and delays necessarily caused by the failure of the Owner or Engineer. <br />19. Payment to Contractor <br />19.1 At least ten (10) days before each progress payment falls due (but not more often than once a <br />month), the Contractor will submit to the Engineer a partial payment estimate filled out and signed <br />by the Contractor covering the work performed during the period covered by the partial payment <br />estimate and supported by such data as the Engineer may reasonably require. If payment is requested <br />on the basis of materials and equipment not incorporated in the work but delivered and suitably stored <br />at or near the site, the partial payment estimate shall also be accompanied by such supporting data, <br />satisfactory to the Owner, as will establish the Owner's title to the material and equipment and protect <br />General Conditions 00700 - 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.