My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2 SR 01-02-2024
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2024
>
01-02-2024
>
4.2 SR 01-02-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 2:12:28 PM
Creation date
12/29/2023 8:08:17 AM
Metadata
Fields
Template:
City Government
type
SR
date
1/2/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rolling Hills Pond Dredging <br />Ell< River, Minnesota <br />16.2 All removal and replacement work shall be done at the Contractor's expense. If the Contractor <br />does not take action to remove such rejected work within ten (10) days after receipt of written notice, <br />the Owner may remove such work and store the materials at the expense of the Contractor. <br />17. Subsurface Conditions <br />17.1 The Contractor shall promptly, and before such conditions are disturbed except in the event of <br />an emergency, notify the Owner by written notice o£ <br />17.1.1 Subsurface or latent physical conditions at the site differing materially from those indicated in <br />the Contract Documents, or <br />17.1.2 Unknown physical conditions at the site, of an unusual nature, differing materially from those <br />ordinarily encountered and generally recognized as inherent in work of the character provided for in <br />the Contract Documents. <br />17.2 The Owner shall promptly investigate the conditions, and if it is found that such conditions do <br />so materially differ and cause an increase or decrease in the cost of, or in the time required for, <br />performance of the work, an equitable adjustment shall be made and the Contract Documents shall <br />be modified by a Change Order. Any claim of the Contractor for adjustment hereunder shall not be <br />allowed unless the required written notice has been given; provided that the Owner may, if the Owner <br />determines the facts to justify; consider and adjust any such claims asserted before the date of final <br />payment. <br />18. Suspension of Work, Termination, and Delay <br />18.1 The Owner may suspend the work or any portion thereof for a period of not more than ninety <br />(90) days or such further time as agreed upon by the Contractor, by written notice to the Contractor <br />and the Engineer which shall fix the date on which work shall be resumed. The Contractor will resume <br />that work on the date so fixed. The Contractor will be allowed an increase in the contract price or an <br />extension of the contract time, or both, directly attributable to any suspension. <br />18.2 If the Contractor is adjudged bankrupt or insolvent, or makes a general assignment for the <br />benefit of its creditors, or if a trustee or receiver is appointed for the Contractor or for any of its <br />property, or if Contractor files a petition to take advantage of any debtor's act, or to reorganize under <br />the bankruptcy or applicable laws, or repeatedly fails to supply sufficient skilled workers or suitable <br />materials or equipment, or repeatedly fails to make prompt payments to subcontractors or for labor, <br />materials or equipment, or disregards laws, ordinances, rules, regulations or orders of any public body <br />having jurisdiction of the work, or disregards the authority of the Engineer, or otherwise violates any <br />provision of the Contract Documents, then the Owner may, without prejudice to any other right or <br />remedy and after giving the Contractor and its surety a minimum of ten (10) days from delivery of a <br />written notice, terminate the services of the Contractor and take possession of the project and of all <br />materials, equipment, tools, construction equipment and machinery thereon owned by the Contractor, <br />and finish the work by whatever method the Owner may deem expedient. In such case, the Contractor <br />General Conditions 00700 - 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.