My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. SR 01-17-2006
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2006
>
01/17/2006
>
5.1. SR 01-17-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:42 AM
Creation date
1/13/2006 9:13:41 AM
Metadata
Fields
Template:
City Government
type
SR
date
1/17/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ARTIST'S CONCEPT <br />SITE CONCEPT "e" <br /> <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />E~ <br />River <br /> <br />SITE FEASIBILITY STUDY <br />GREAT RIVER REGIONAL LIBRARY SYSTEM <br />CITY OF ELK RIVER <br /> <br />· Views and Aesthetic Qualities: Locating the new library on a site with natural <br />aesthetic qualities is significant - especially when looking to the future and the potentials <br />for enhancing the qualities with the building and site design. Site C is attractive and <br />defined by tree lines. These view and the defined limits of the site will not change with <br />development. The views and proximities to the Lake and Dam will also not be changed <br />with the construction of the library. <br /> <br />· Site Development Costs: The existing conditions dictate the potential costs for the <br />development of each site. Preliminary site development costs were prepared based <br />upon the program assumptions and preliminary site design concepts. Development <br />costs for Site C have been projected to be about $87.000 for a new structure. <br /> <br />The analysis indicates that both of the sites A and B offer good opportunities for construction of <br />the replacement library. Costs associated with relocating and temporary provisions during <br />construction impact Site A negatively. The "retained asset value" of constructing on a new site <br />offers financial benefits beyond the first cost construction pricing. On balance, Site Option "C" <br />will provide the most satisfactory long-range site solution for the library construction. <br /> <br />~ ~ . . - . -c:..\""- <br />~ ' .-. ----. <br /> <br /> <br />--~.-! <br /> <br />'~ <br />~ ~ =:::z <br />--~~ - - ~ . <br />--- ~---, <br />- ~ -- <br />~. <br />. ~~ <br />~ <br /> <br />KKE ARCHITECTS: 0606.1159.01 <br /> <br />SITE FEASIBILITY STUDY REPORT <br /> <br />- 3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.