My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.10 SR 10-16-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
10-16-2023
>
4.10 SR 10-16-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2023 10:10:11 AM
Creation date
10/13/2023 8:38:52 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/16/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
East Fiber Extension <br />Elk River, Minnesota <br /> <br /> <br />changes should be recorded on a Change Order as they occur so that they may be included in the partial <br />payment estimate. <br /> <br />15. Time for Completion and Liquidated Damages <br />15.1 The date of beginning and the time for completion of the work are essential conditions of the <br />Contract Documents, and the work embraced shall be commenced on the date specified in the Notice <br />to Proceed. <br />15.2 The Contractor will proceed with the work at such rate of progress to insure full completion <br />within the contract time. It is expressly understood and agreed, by and between the Contractor and the <br />Owner, that the contract time for the completion of the work described herein is a reasonable time, <br />taking into consideration the average climatic and economic conditions and other factors prevailing in <br />the locality of the work. <br /> <br />15.3 If the Contractor shall fail to complete the work within the contract time, or extension of time <br />granted by the Owner, then the Contractor will pay to the Owner the amount for liquidated damages as <br />specified in the Bid for each calendar day that the Contractor shall be in default after the time stipulated <br />in the Contract Documents. <br />15.4 The Contractor shall not be charged with liquidated damages or any excess cost when the delay in <br />completion of the work is due to the following, and the Contractor has promptly given written notice of <br />such delay to the Owner or Engineer. <br />15.4.1 To any preference, priority or allocation order duly issued by the Owner. <br />15.4.2 Tounforeseeable causes beyond the control and without the fault or negligence of the <br />Contractor, including but not restricted to acts of God, or of the public enemy, acts of the Owner, acts <br />of another Contractor in the performance of a contract with the Owner, fires, floods, epidemics, <br />quarantine restrictions, strikes, freight embargoes, and abnormal and unforeseeable weather. <br />15.4.3 To any delays of subcontractors occasioned by any of the causes specified in paragraphs 15.4.1 <br />and 15.4.2 of this article. <br />16. Correction of Work <br /> <br />16.1 The Contractor shall promptly remove from the premises all work rejected by the Engineer for <br />failure to comply with the Contract Documents whether incorporated in the construction or not, and <br />the Contractor shall promptly replace and re-execute the work in accordance with the Contract <br />Documents and without expense to the Owner and shall bear the expense of making good all work of <br />other Contractors destroyed or damaged by such removal or replacement. <br />00700 -9 <br />General Conditions <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.