My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.10 SR 10-16-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
10-16-2023
>
4.10 SR 10-16-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2023 10:10:11 AM
Creation date
10/13/2023 8:38:52 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/16/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
East Fiber Extension <br />Elk River, Minnesota <br /> <br /> <br />of death, occupational disease, and injury requiring medical attention or causing loss of time from work, <br />arising out of and in the course of employment of work under the Contract. <br />11.5 The Contractor alone shall be responsible for the safety, efficiency, and adequacy of its plant, <br />appliances, and methods, and for any damage which may result from their failure of their improper <br />construction,maintenance, or operation. <br /> <br />12. Supervision by Contractor <br />12.1 TheContractor shall supervise and direct the work. He will be solely responsible for the means, <br />methods, techniques, sequences and procedures of construction. The Contractor will employ and <br />maintain on the work a qualified supervisor or superintendent who shall have been designated in writing <br />by the Contractor as the Contractor's representative at the site. The supervisor shall have full authority <br />to act on behalf of the Contractor and all communications given to the supervisor shall be as binding as <br />if given to the Contractor. The supervisor shall be present on the site at all times as required to perform <br />adequate supervision and coordination of the work. <br />13. Changes in the Work <br /> <br />13.1 The Owner may at any time, as the need arises, order changes within the scope of the work <br />without invalidating the Agreement. If such changes increase or decrease the amount due under the <br />Contract Documents, or the time required for performance of the work, an equitable adjustment shall <br />be authorized by Change Order. <br /> <br />13.2 The Engineer, also, may at any time, by issuing a Field Order, make changes in the details of the <br />work. The Contractor shall proceed with the performance of any changes in the work so ordered by the <br />Engineer unless the Contractor believes that such field order entitles the Contractor to a change in <br />contract price or time, or both, in which event the Contractor shall give the Engineer written notice <br />thereof within seven (7) days after the receipt of the ordered change. Thereafter, the Contractor shall <br />document the basis for the change in contract price or time within thirty (30) days. The Contractor shall <br />not execute such changes pending the receipt of an executed Change Order or further instruction from <br />the Owner. <br /> <br />14.Changes inContract Price <br /> <br />14.1 The contract price may be changed only by a Change Order. The value of any work covered by a <br />Change Order or of any claim for increase or decrease in the contract price shall be determined by one <br />or more of the following methods in the order of precedence listed below: <br /> a) Unit prices previously approved <br /> b) An agreed lump sum <br /> <br />14.2 The contract Change Order will include extra work, work for which quantities have been altered <br />from those shown in the bidding schedule, as well as decreases or increases in the quantities of installed <br />units which are different than those shown in the bidding schedule because of final measurements. All <br />00700 -8 <br />General Conditions <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.