My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.10 SR 10-16-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
10-16-2023
>
4.10 SR 10-16-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2023 10:10:11 AM
Creation date
10/13/2023 8:38:52 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/16/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
East Fiber Extension <br />Elk River, Minnesota <br /> <br /> <br />3.2.2 Respectivedates for submission of shop drawings, the beginning of manufacture, the testing and <br />the installation of materials, supplies, and equipment. <br />3.3 The Contractor shall also submit a schedule of payments that the Contractor anticipates will be <br />earned during the course of the work. <br />4. Drawings and Specifications <br />4.1 The intent of the drawings and specifications is that the Contractor shall furnish all labor, materials, <br />tools, equipment, and transportation necessary for the proper execution of the work in accordance with <br />the Contract Documents and all incidental work necessary to complete the Project in an acceptable <br />manner, ready for use, occupancy or operation by the Owner. <br />4.2 In case of conflict between the drawings and specifications, the specifications shall govern. Figure <br />dimensions on drawings shall govern over general drawings. <br />4.3 Any discrepancies found between the drawings and specifications and site conditions or any <br />inconsistencies or ambiguities in the drawings or specifications shall be immediately reported to the <br />Engineer, in writing, who shall promptly correct such inconsistencies or ambiguities in writing. Work <br />done by the Contractor after discovery of such discrepancies, inconsistencies or ambiguities shall be <br />done at the Contractor's risk. <br />5. Shop Drawings <br />5.1 The Contractor shall provide shop drawings as may be necessary for the prosecution of the work as <br />required by the Contract Documents. The Engineer shall promptly review all shop drawings. The <br />Engineer's approval of any shop drawing shall not release the Contractor from responsibility for <br />deviations from the Contract Documents. The approval of any shop drawing which substantially <br />deviates from the Contract Documents shall be evidenced by a Change Order. <br />5.2 When submitted for the Engineer's review, shop drawings shall bear the Contractor's certification <br />that he has reviewed, checked and approved the shop drawings, and that they are in conformance with <br />the requirements of the Contract Documents. <br />5.3 Portions of the work requiring a shop drawing or sample submission shall not begin until the shop <br />drawing or submission has been approved by the Engineer. A copy of each approved shop drawing and <br />each approved sample shall be kept in good order by the Contractor at the site and shall be available to <br />the Engineer. A copy of the approved shop drawings shall be provided to the Owner. <br />6. Materials, Services, and Facilities <br />6.1 It is understood that, except as otherwise specifically stated in the Contract Documents, the <br />Contractor shall provide and pay for all materials, labor, tools, equipment, water, light, power, <br />00700 -4 <br />General Conditions <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.