My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.10 SR 10-16-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
10-16-2023
>
4.10 SR 10-16-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2023 10:10:11 AM
Creation date
10/13/2023 8:38:52 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/16/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
East Fiber Extension <br />Elk River, Minnesota <br /> <br /> <br />1.21 Subcontractor-An individual, firm, or corporation having a direct contract with Contractor or <br />with any other subcontractor for the performance of a part of the work at the site. <br />1.22 Substantial Completion - That date certified by the Engineer when the construction of the Project <br />or a specified part thereof is sufficiently completed, in accordance with the Contract Documents, so that <br />the Project or specified part can be utilized for the purposes for which it is intended. <br />1.23 Supplemental General Conditions - Modifications and/or additions to the General Conditions or <br />such requirements that may be imposed by applicable state laws. <br />1.24 Supplier - Any person or organization who supplies materials or equipment for the work, including <br />the fabricated special design, but who does not perform labor at the site. <br />1.25 Work - All labor necessary to produce the construction required by the Contract Documents, and <br />all materials and equipment incorporated or to be incorporated in the Project. <br />1.26 Written Notice -Any notice to any party of the Agreement relative to any part of this Agreement <br />in writing and considered delivered and the service thereof completed, when posted by certified or <br />registered mail to the said party at their last given address, or delivered in person to said party or their <br />authorized representative on the work. <br /> <br />2. Additional Instructions and Detail Drawings <br /> <br />2.1 The Contractor may be furnished additional instructions and detail drawings, by the Engineer, as <br />necessary to carry out the work required by the Contract Documents. <br /> <br />2.2 The additional drawings and instructions thus supplied will become a part of the Contract <br />Documents. The Contractor shall carry out the work in accordance with the additional detail drawings <br />and instructions. <br />3. Schedules, Reports and Records <br />3.1 The Contractor shall submit to the Owner such schedule of quantities and costs, progress <br />schedules, payrolls, reports, estimates, records and other data where applicable, as are required by the <br />Contract Documents for the work to be performed. <br />3.2 Prior to the first partial payment estimate, the Contractor shall submit construction progress <br />schedules showing the order in which the Contractor proposes to carry on the work, including dates at <br />which the various parts of the work will be started, estimated date of completion of each part, and, as <br />applicable: <br />3.2.1 The dates at which special detail drawings will be required; and <br />00700 -3 <br />General Conditions <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.