My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.11. & 7.12. SR 12-19-2005
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2005
>
12/19/2005
>
7.11. & 7.12. SR 12-19-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:41 AM
Creation date
12/16/2005 11:53:01 AM
Metadata
Fields
Template:
City Government
type
SR
date
12/19/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Pro source Technologies <br />December 19,2005 <br /> <br />Page 2 <br /> <br />Overview <br /> <br />The applicant, on behalf of Nextel, is proposing to rezone an area of 50' X 50' to Antenna <br />Overlay and requesting a conditional use permit for a 150' tall antenna tower. The proposed <br />tower will be located on city property, and the city will be placing it's 850 meghertz <br />equipment on the tower. The area is part of a larger 12 acre parcel, which is developed as the <br />city softball complex. The surrounding property is zoned R1 c. The surrounding land uses <br />include the softball complex, Elk River City Hall complex and the Sherburne County <br />fairgrounds. <br /> <br />The Board of Adjustment granted the applicant's request for a variance to the tower setback <br />requirement. The variance allowed a setback of 50 feet instead of the required 150. <br /> <br />Rezoning <br /> <br />In order to construct the proposed tower, a rezoning to AT is required. This overlay district <br />was established to manage the placement of antenna towers and to ensure their proper <br />placement regarding health, safety and welfare of the community. The overlay district does <br />not change the underlying A 1 zoning district, all the uses allowed in the A 1 district will <br />continued to be allowed on land zoned AT. <br /> <br />In considering a rezoning request of this nature, consideration should be given to the <br />compatibility with surrounding land uses and whether the rezoning is necessary to provide <br />effective wireless telecommunication coverage for the city. The proposed rezoning is <br />compatible with the surrounding land uses. The applicant has shown that this site is <br />necessary to provide effective wireless coverage for the city. The rezoning is also consistent <br />with the Comprehensive Plan for the city. <br /> <br />Conditional Use Permit <br /> <br />Co-location Requirements <br /> <br />The applicant has looked at co-locating on other sites within the city. They found that there <br />are no acceptable co-location opportunities within one mile of the proposed site. The City <br />will be co-locating it's 850 megahertz equipment on the tower. At a height of 150 feet, the <br />tower will provide the opportunity for 1 additional carrier. <br /> <br />Construction Requirements <br /> <br />The applicant will comply with the construction requirements outlined in the ordinance. <br /> <br />Design Standards <br /> <br />The proposed tower will be a mono-pole with a flat gray galvanized steel finish which will <br />blend in with the sky. The communication equipment at the base of the tower will be located <br />in a small shelter. The exterior of the shelter will be face brick to match the exterior of the <br /> <br />S:\PLANNING\Case Files\2005\CU 05-27 Prosource Technologies\CU05-27CC12-19.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.