Laserfiche WebLink
Williams asked if it could potentially be 4 to 5 years before it’s ready to be programmed. Mr. <br />Tabone said that is correct and the plan is to start construction in the northwest corner, <br />Outlot D. <br /> <br />Mr. Stremcha asked if Lennar reviewed Outlot C as potential for park dedication with a trail <br />connection through the middle. Mr. Tabone did make note of that since the request was to <br />remove the trail on the west side but isn’t sure his engineer had time to vet the upland area <br />with a trail corridor through there. He thinks that would be a great idea to wrap linear trails <br />through ponds and wetlands as it is a great aesthetic feature. He has no doubt the 34 acres <br />will change as the plans are fine tuned. <br /> <br />Commissioner Anderson asked how many acres Outlot H is. Mr. Hecker shared it is 5.65 <br />acres. Mr. Tabone shared the area will be graded and leveled to be usable. <br /> <br />Commissioner Niziolek is concerned about breaking the park dedication into pieces and <br />would like to see a package with contours and vistas. <br /> <br />1. Moved by Commissioner Loidolt and seconded by Commissioner Rathbun to <br />accept park land in Outlot H for park dedication. Motion carried 6-1 <br /> <br />Commissioner Niziolek opposed. <br /> <br />2. No action was taken to approve lots #180 through #184 be moved to the farthest <br />west in Outlot H at the end of Road A. <br /> <br />3. Moved by Chair Williams and seconded by Commissioner Brown to approve park <br />dedication for Bradford Park plat to be paid for at a pro-rated amount after <br />accounting for the land dedication, which will be determined by staff and the <br />developer, when the lots are released for recording. Chair Williams amended the <br />motion to include Outlot G as needed based on staff discussions with Lennar. <br />Motion carried 5-2. <br /> <br />Commissioners Niziolek and Anderson opposed. <br /> <br />4. Moved by Commissioner Anderson and seconded by Commissioner Niziolek to <br />approve trails in the new development be a minimum of 10-feet wide and the trail <br />around the pond be developed for a full loop. Motion carried 7-0 <br /> <br /> <br />