My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2.b PCSR 05-23-2023
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2023
>
05-23-2023
>
4.2.b PCSR 05-23-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2023 9:34:51 AM
Creation date
5/17/2023 9:28:55 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
5/23/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERMIT APPLICATION TO THE CITY OF ELK RIVER <br />APRIL 2023 <br />Introduction <br /> 1.2 <br /> <br />management (eliminating the lift station) and reduce the amount of controlled fill placement required for <br />perimeter berm construction. For the previous design, stormwater discharge from the site was under the <br />exterior roadway, then under the City of Elk River trail, and ultimately to an upstream wetland on property <br />owned by ERL. The modified design allows for discharge directly west of the proposed pond to an <br />existing low area, on property also owned by the Landfill, east of the trail (eliminating the need for the City <br />trail crossing). <br />The proposed sedimentation pond includes settling basins at the east and west ends. A safety bench has <br />been incorporated into the design and perimeter access for cleaning / maintenance activities has been <br />considered. The proposed pond has been designed to provide flexibility depending on mining activities in <br />the area. The bottom elevation of the pond will be at maximum an elevation of 964; the actual elevation <br />may be 964 or lower depending on mining activities. The design presented herein represents the <br />minimum storage capacity that would be provided and storm events that would be managed. Actual <br />conditions following mining activities may provide for management of larger storm events by increasing <br />the available storage capacity. <br />1.1.1 Landfill Development and Closure Construction <br />Modifications to the stormwater management system features have allowed for a reduction in the width of <br />the perimeter berm on the south termination of the MSW disposal area. Changes to the perimeter <br />grading plan result in a reduction in fill materials required to complete construction / landfill development. <br />Consistent with the previous design, stormwater generated from the southern portion of the Landfill will <br />still be controlled and routed by drainage terraces, downslope structures, perimeter ditching, a nd related <br />stormwater management infrastructure. Stormwater will be routed through these features to the <br />proposed large stormwater basin. The modifications to the stormwater management system components <br />on the Landfill will be incorporated during phased closure construction. <br />The modifications to the Landfill discussed above will primarily be on the existing property permitted and <br />approved for Landfill activities and will be addressed in a subsequent minor permit modification <br />application to the MPCA. <br />1.1.2 Landfill End Use <br />The current end use plan for the Landfill will not change and provides for open green space. Long term, <br />the open space planned for the site would be compatible with any adjacent future use. The end use <br />determined for the site will be consistent with the terms of previous agreements.
The URL can be used to link to this page
Your browser does not support the video tag.