My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2.b PCSR 05-23-2023
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2023
>
05-23-2023
>
4.2.b PCSR 05-23-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2023 9:34:51 AM
Creation date
5/17/2023 9:28:55 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
5/23/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERMIT APPLICATION TO THE CITY OF ELK RIVER <br />APRIL 2023 <br />Introduction <br /> 1.1 <br /> <br />1.0 INTRODUCTION <br />Elk River Landfill, Inc. (ERL), a wholly owned subsidiary of Waste Management of Minnesota, Inc., owns <br />and operates a mixed municipal solid waste (MSW) landfill (Landfill) under Minnesota Solid Waste Permit <br />Number SW-74. The Landfill is located along U.S. TH 169 in the NW ¼ of Section 3, T33N, R26W, and <br />the SW ¼ of Section 34, T34N, R26W, Sherburne County, Minnesota (see Figure 1). Besides the <br />construction and demolition debris (C&D) landfill immediately and adjacent to the north of the Landfill, the <br />remainder of the existing property owned by ERL provides a buffer surrounding the Landfill. The Landfill <br />is permitted to accept MSW, C&D, yard waste for composting, industrial waste in accordance with a <br />MPCA-approved Industrial Solid Waste Management Plan, and processing facility rejects. <br />ERL maintains a Solid Waste Facility (SWF) license and conditional use permits in accordance with City <br />of Elk River (the City or City) requirements. ERL and the City entered into an agreement on May 25, 2011 <br />for the expansion of the facility into an area referred to as the southern development area (SDA). Based <br />on the agreement, a Land Use Application was submitted to the City of Elk River dated June 27, 2011. <br />Subsequently, the application and an amended Conditional Use Permit (CUP) was approved by the Elk <br />River City Council on September 19, 2011. The SWF license references the amended CUP, and the two <br />documents authorize construction and operation of the currently permitted facility. <br />ERL is proposing to revise the CUP to incorporate approximately 20 additional acres of property, <br />immediately to the south of the currently permitted landfill footprint. The additional 20 acres provides no <br />additional MSW capacity, but instead will be used for improved stormwater management. Concurrent to <br />the proposed CUP revision, ERL is proposing an ordinance amendment to Elk River Code, Chapter 30. <br />Land Development Regulations, Article VI. Zoning, Division 10, Sec. 30 -1834.(e) to allow for stormwater <br />management features for the landfill to be located outside of the SWF solid waste facility overlay district <br />boundary. <br />A request for minor modification to the Landfill’s MPCA Solid Waste permit (SW-74) will also be submitted <br />to reflect the changes to the site grading and stormwater management features. <br />1.1 DESCRIPTION OF PROJECT <br />The additional 20-acres of property has been purchased by ERL from Tiller Corporation, now part of <br />Martin Marietta (Tiller). The property is currently used by Tiller for its gravel mining operation, as they <br />retained mineral rights on the property per the terms of the purchase. As has been the practice at the <br />existing Landfill, development of Landfill related components (in this case the proposed stormwater <br />management infrastructure) will follow behind Tiller's mining operations. Tiller has an approved CUP from <br />the City for their mining activity (including the 20-acre subject property). <br />The additional property will allow for ERL to construct one large stormwater basin to replace the currently <br />permitted design which included two sedimentation basins and would have required a lift station to <br />manage stormwater from the Landfill. The modifications will allow for gravity drainage for stormwater
The URL can be used to link to this page
Your browser does not support the video tag.